GENERAL VISUAL INSPECTION OF AIR INTAKE (EWIS) (INTERNAL AREA AS FAR AS VISIBLE)
TASK 05-24-30-210-801-A
GENERAL VISUAL INSPECTION OF AIR INTAKE (EWIS) (INTERNAL AREA AS FAR AS VISIBLE)
Refer to the MPD TASK: ZL-433-02
GENERAL VISUAL INSPECTION OF AIR INTAKE (EWIS) (INTERNAL AREA AS FAR AS VISIBLE)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-24-30-010-053-A ** ON A/C NOT FOR ALL
Subtask 05-24-30-210-053-A ** ON A/C NOT FOR ALL
Subtask 05-24-30-410-053-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 22:49:55 UTC
GENERAL VISUAL INSPECTION OF AIR INTAKE (EWIS) (INTERNAL AREA AS FAR AS VISIBLE)
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
1. Reason for the JobRefer to the MPD TASK: ZL-433-02
GENERAL VISUAL INSPECTION OF AIR INTAKE (EWIS) (INTERNAL AREA AS FAR AS VISIBLE)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 433 | AIR INTAKE LIP |
| 434 | AIR INTAKE LIP |
| 443 | AIR INTAKE LIP |
| 444 | AIR INTAKE LIP |
| 434AZ, 437AL, 438AR, 444AZ, 447AL, 448AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-802-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-802-A | Closing of the Fan Cowl Doors |
| TASK 71-61-11-000-801-A | Removal of the Aft Bulkhead T2 Panel |
| TASK 71-61-11-400-801-A | Installation of the Aft Bulkhead T2 Panel |
Subtask 05-24-30-010-053-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) in position at zone 433 (443).
(2) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-802):
437AL 438AR 447AL and 448AR.
(3) Remove the access panels (Ref. AMM TASK 71-61-11-000-801):
434AZ and 444AZ.
4. Procedure(1) Put an ACCESS PLATFORM 2M (6 FT) in position at zone 433 (443).
(2) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-802):
437AL 438AR 447AL and 448AR.
(3) Remove the access panels (Ref. AMM TASK 71-61-11-000-801):
434AZ and 444AZ.
Subtask 05-24-30-210-053-A ** ON A/C NOT FOR ALL
A. Do a general visual inspection of the air intake (internal area as far as visible).
Make sure that:
5. Close-upMake sure that:
- There is no damage (corrosion, leaks or cracks) on all the parts of the components and the structure that you can see
- All the installations (wiring, piping, ducting) are correctly attached.
Subtask 05-24-30-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels (Ref. AMM TASK 71-61-11-400-801):
434AZ and 444AZ.
(3) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
437AL 438AR 447AL and 448AR.
(4) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels (Ref. AMM TASK 71-61-11-400-801):
434AZ and 444AZ.
(3) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
437AL 438AR 447AL and 448AR.
(4) Remove the access platform(s).
Access Door of the Left Nacelle (Left Side)