W DOC AIRBUS | AMM A320F

Installation of the Aft Bulkhead T2 Panel [PW11]


TASK 71-61-11-400-801-A
Installation of the Aft Bulkhead T2 Panel


WARNING: WEAR APPLICABLE PERSONAL PROTECTIVE EQUIPMENT (PPE) WHEN YOU DO THIS TASK. BEFORE YOU USE PPE, READ, UNDERSTAND AND OBEY ALL INSTRUCTIONS FOR ITS USE. THESE INSTRUCTIONS INCLUDE INSTRUCTIONS FROM THE MANUFACTURER, YOUR EMPLOYER AND GOVERNMENT REGULATIONS. YOU CAN GET INJURED IF YOU DO NOT USE PPE. GET INSTRUCTIONS FROM YOUR EMPLOYER ON WHICH PPE IS NECESSARY.
WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AND THE ADJACENT COMPONENTS AFTER ENGINE SHUTDOWN. THE ENGINE, THE ENGINE OIL AND THE ADJACENT COMPONENTS CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
Torque wrench: range to between 35 and 30 lbf.in (0.40 and 0.34 m.daN ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR
FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-00-00-860-833-A
Procedure to Prevent Engine Motoring
TASK 71-13-00-010-802-A
Opening of the Fan Cowl Doors
TASK 71-13-00-410-802-A
Closing of the Fan Cowl Doors
3. Job Set-up
Subtask 71-61-11-941-051-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
Subtask 71-61-11-010-051-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Make sure that the fan cowl doors are opened (Ref. AMM TASK 71-13-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
4. Procedure
CAUTION: WIPE CLEAN ALL PARTS AND TOOLS AS NECESSARY TO REMOVE UNWANTED DEBRIS AND PREVENT DAMAGE TO THE ENGINE.
Subtask 71-61-11-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Aft Bulkhead T2 Panel (3)
   (1) Attach the aft bulkhead T2 panel (3) to the inlet cowl with the 32 bolts (1) and the 32 washers (2).
   (2) TORQUE the bolts (1) to between 35 and 30 lbf.in (0.40 and 0.34 m.daN ) T.
NOTE: Make sure that you install the T2 probe and the grounding strap before you tighten the 32 bolts.
5. Close-up
Subtask 71-61-11-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021] 2026.04.01 03:51:39 UTC