GENERAL VISUAL INSPECTION OF TAIL CONE APU EXHAUST AREA (EWIS)
TASK 05-23-10-200-004-A
GENERAL VISUAL INSPECTION OF TAIL CONE APU EXHAUST AREA (EWIS)
Refer to the MPD TASK: ZL-317-01
GENERAL VISUAL INSPECTION OF TAIL CONE APU EXHAUST AREA (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-23-10-010-053-A
Subtask 05-23-10-210-053-A
Subtask 05-23-10-410-053-A
[Rev.10 from 2021]
2026.03.31 22:49:30 UTC
GENERAL VISUAL INSPECTION OF TAIL CONE APU EXHAUST AREA (EWIS)
ZONE: 317
1. Reason for the JobRefer to the MPD TASK: ZL-317-01
GENERAL VISUAL INSPECTION OF TAIL CONE APU EXHAUST AREA (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 5M (16 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 317 | TAIL CONE APU AND ACCESSORY COMPARTMENT |
| 317AL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 52-41-18-000-001-A | Removal of the APU Exhaust Access-Fairing |
| TASK 52-41-18-400-001-A | Installation of the APU Exhaust Access-Fairing |
Subtask 05-23-10-010-053-A
A. Get Access
(1) Put an ACCESS PLATFORM 5M (16 FT) in position at the zone 310.
(2) Remove the access fairing 317AL.
(Ref. AMM TASK 52-41-18-000-001)
4. Procedure(1) Put an ACCESS PLATFORM 5M (16 FT) in position at the zone 310.
(2) Remove the access fairing 317AL.
(Ref. AMM TASK 52-41-18-000-001)
Subtask 05-23-10-210-053-A
A. Inspection
(1) Do a general visual inspection of the Auxiliary Power Unit (APU) exhaust area on the tail cone.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up(1) Do a general visual inspection of the Auxiliary Power Unit (APU) exhaust area on the tail cone.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
Subtask 05-23-10-410-053-A
A. Close Access
(1) Install the access fairing 317AL.
(Ref. AMM TASK 52-41-18-400-001)
(2) Remove the access platform(s).
(1) Install the access fairing 317AL.
(Ref. AMM TASK 52-41-18-400-001)
(2) Remove the access platform(s).