General Visual Inspection of MLG-Well and Hydraulic Compartment (EWIS)
TASK 05-21-40-200-005-A
General Visual Inspection of MLG-Well and Hydraulic Compartment (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-147-03
GENERAL VISUAL INSPECTION OF MLG-WELL AND HYDRAULIC COMPARTMENT (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-21-40-010-054-A
Subtask 05-21-40-210-054-A
Subtask 05-21-40-410-054-A
[Rev.10 from 2021]
2026.03.31 22:48:48 UTC
General Visual Inspection of MLG-Well and Hydraulic Compartment (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-147-03
GENERAL VISUAL INSPECTION OF MLG-WELL AND HYDRAULIC COMPARTMENT (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | 1 | FLASHLIGHT |
| No specific | 1 | MIRROR - INSPECTION |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 147 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| 148 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| 147AB, 147EB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 53-35-13-000-001-A | Removal of the Belly Fairing Access Panels |
| TASK 53-35-13-400-001-A | Installation of the Belly Fairing Access Panels |
Subtask 05-21-40-010-054-A
A. Not Applicable
4. ProcedureSubtask 05-21-40-210-054-A
A. Inspection
(1) Inspection through access panels 147AB and 147EB:
(a) Put the ACCESS PLATFORM 2M (6 FT) in position at zones 147 and 148.
(b) Remove access panels 147AB and 147EB (Ref. AMM TASK 53-35-13-000-001).
(c) If necessary, use the FLASHLIGHT and the MIRROR - INSPECTION to do the inspection.
(d) Do a General Visual Inspection (GVI) of the MLG well and hydraulic compartment (zones 147 and 148). This inspection includes the APU bleed-air piping.
(e) Make sure that:
(g) Install access panels 147AB and 147EB (Ref. AMM TASK 53-35-13-400-001).
(h) Remove the access platform(s).
(2) Inspection through the MLG doors 734 (744):
(a) Open MLG doors 734 (744) (Ref. AMM TASK 32-12-00-010-001).
(b) Put the ACCESS PLATFORM 2M (6 FT) in position at zones 147 and 148.
(c) If necessary, use the FLASHLIGHT and the MIRROR - INSPECTION to do the inspection.
(d) Do a GVI of the MLG well and hydraulic compartment (zones 147 and 148).
(e) Make sure that:
(g) Remove the access platform(s).
(h) Close MLG doors 734 (744) (Ref. AMM TASK 32-12-00-410-001).
5. Close-up(1) Inspection through access panels 147AB and 147EB:
(a) Put the ACCESS PLATFORM 2M (6 FT) in position at zones 147 and 148.
(b) Remove access panels 147AB and 147EB (Ref. AMM TASK 53-35-13-000-001).
(c) If necessary, use the FLASHLIGHT and the MIRROR - INSPECTION to do the inspection.
(d) Do a General Visual Inspection (GVI) of the MLG well and hydraulic compartment (zones 147 and 148). This inspection includes the APU bleed-air piping.
(e) Make sure that:
- There is no damage (corrosion, leaks or cracks) on all the parts of the components and the structure that you can see.
- All the installations (wiring, ducting and piping) are correctly attached.
(g) Install access panels 147AB and 147EB (Ref. AMM TASK 53-35-13-400-001).
(h) Remove the access platform(s).
(2) Inspection through the MLG doors 734 (744):
(a) Open MLG doors 734 (744) (Ref. AMM TASK 32-12-00-010-001).
(b) Put the ACCESS PLATFORM 2M (6 FT) in position at zones 147 and 148.
(c) If necessary, use the FLASHLIGHT and the MIRROR - INSPECTION to do the inspection.
(d) Do a GVI of the MLG well and hydraulic compartment (zones 147 and 148).
(e) Make sure that:
- There is no damage (corrosion, leaks or cracks) on all the parts of the components and the structure that you can see.
- All the installations (wiring, ducting and piping) are correctly attached.
(g) Remove the access platform(s).
(h) Close MLG doors 734 (744) (Ref. AMM TASK 32-12-00-410-001).
Subtask 05-21-40-410-054-A
A. Remove all the fixtures, tools, test and support equipment used during this procedure.
MLG-Well and Hydraulic Compartment