75-21 (CFML) - HPT ACTIVE CLEARANCE CONTROL (ACC) SYSTEM
75-21-00 (CFML) - HPT ACTIVE CLEARANCE CONTROL (ACC) SYSTEM
-
PB.001 CONF:[03] HPT ACTIVE CLEARANCE CONTROL (ACC) SYSTEM - DESCRIPTION AND OPERATION
-
PB.401 CONF:[03] HPT ACTIVE CLEARANCE CONTROL (ACC) SYSTEM - DEACTIVATION/REACTIVATION
-
75-21-00-040-801-A
[CFML]
[10]
Deactivation of the High Pressure Turbine Active Clearance Control (HPTACC) Valve
-
75-21-00-440-801-A
[CFML]
[10]
Reactivation of the High Pressure Turbine Active Clearance Control (HPTACC) Valve
75-21-05 (CFML) - VALVE - HPT (HIGH PRESSURE TURBINE) ACC (ACTIVE CLEARANCE CONTROL), ENGINE
-
PB.401 CONF:[03] VALVE - HPT (HIGH PRESSURE TURBINE) ACC (ACTIVE CLEARANCE CONTROL), ENGINE - REMOVAL/INSTALLATION
-
75-21-05-000-801-A
[CFML]
[10]
Removal of the High Pressure Turbine (HPT) Active Clearance Control (ACC) Valve
-
75-21-05-400-801-A
[CFML]
[10]
Installation of the High Pressure Turbine (HPT) Active Clearance Control (ACC) Valve
-
PB.601 CONF:[03] VALVE - HPT (HIGH PRESSURE TURBINE) ACC (ACTIVE CLEARANCE CONTROL), ENGINE - INSPECTION/CHECK
-
75-21-05-210-801-A
[CFML]
[10]
Visual Inspection of the High Pressure Turbine (HPT) Active Clearance Control (ACC) Valve
75-21-10 (CFML) - DUCT - HPT (HIGH PRESSURE TURBINE) ACC (ACTIVE CLEARANCE CONTROL)
-
PB.401 CONF:[03] DUCT - HPT (HIGH PRESSURE TURBINE) ACC (ACTIVE CLEARANCE CONTROL) - REMOVAL/INSTALLATION
-
75-21-10-000-803-A
[CFML]
[10]
Removal of the High Pressure Turbine (HPT) Active Clearance Control (ACC) Wye Duct
-
75-21-10-400-803-A
[CFML]
[10]
Installation of the High Pressure Turbine (HPT) Active Clearance Control (ACC) Wye Duct
-
PB.601 CONF:[03] DUCT - HPT (HIGH PRESSURE TURBINE) ACC (ACTIVE CLEARANCE CONTROL) - INSPECTION/CHECK
-
75-21-10-210-801-A
[CFML]
[10]
Visual Inspection of the High Pressure Turbine (HPT) Active Clearance Control (ACC) Wye Duct