MLG Door (RH) Does Not Close Fully or Slow to Operate
TASK 32-31-00-810-861-A
MLG Door (RH) Does Not Close Fully or Slow to Operate
A. Referenced Information
3. Fault Confirmation
Subtask 32-31-00-860-093-A
Subtask 32-31-00-810-119-A
Subtask 32-31-00-942-061-A
[Rev.8 from Aug 2018]
2026.04.04 04:31:24 UTC
MLG Door (RH) Does Not Close Fully or Slow to Operate
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. MOVEMENT OF THE LANDING GEAR CAN CAUSE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Possible Causes- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
- RH MLG door clearance
- RH MLG door uplock unit and rollers
- RH MLG door forward and aft fittings
- UPLOCK ASSY-MLG DOOR, R [2520GM]
2522GM - BYPASS VALVE-MLG DOOR GROUND OPENING, R [2518GM]
[41GA] - MANIFOLD ASSY-L/G AND DOOR SELECTOR VALVES [2524GM]
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TSM TASK 32-31-00-810-898-A | L/G - All Landing Gears and all Landing Gear Doors Slow Operation |
| AMM 32-12-00-710-002 | Operational Test of the Main Landing Gear (MLG) Doors Ground-Opening-Mechanism |
| AMM 32-12-11-400-001 | Installation of the Door Assembly - Main |
| AMM 32-31-00-200-001 | Detailed Inspection of Gear Uplock and Door Uplock Units and Rollers |
| AMM 32-31-00-200-003 | Detailed Inspection of Retraction Actuator |
| AMM 32-31-00-210-002 | General Visual Inspection of L/G Extension/Retraction System Components |
| AMM 32-31-00-720-002 | Functional Test of the Normal Extension and Retraction of the Landing Gear |
| AMM 32-31-13-000-001 | Removal of the MLG Door Ground-Opening Bypass-Valve |
| AMM 32-31-13-400-001 | Installation of the MLG Door Ground-Opening Bypass-Valve |
| AMM 32-31-31-000-001 | Removal of the Selector-Valve Manifold Assembly |
| AMM 32-31-31-400-001 | Installation of the Selector-Valve Manifold Assembly |
| AMM 32-31-33-000-001 | Removal of the MLG Door Uplock 2520GM |
| AMM 32-31-33-400-002 | Installation of the MLG Door Uplock 2520GM |
| AMM 32-31-34-000-001 | Removal of the Landing-Gear (L/G) Door Selector Valve |
| AMM 32-31-34-400-001 | Installation of the Landing-Gear (L/G) Door Selector Valve |
| AMM 32-31-35-000-001 | Removal of the MLG Door Actuating-Cylinder |
| AMM 52-81-00-200-001 | Detailed Inspection of MLG Door, Forward and Aft Fittings, LH/RH |
Subtask 32-31-00-860-093-A
A. Test
(1) Do a check of the Post Flight Report:
4. Fault Isolation(1) Do a check of the Post Flight Report:
- if two CFDS R L/G DOOR CLOSED PROX SNSR TGT POS messages related to the same door, for the same flight are shown
or - if the ECAM WARNING, DOORS NOT CLOSED with two CFDS R L/G DOOR CLOSED PROX SNSR TGT POS messages related to the same door are shown
or - if the MLG door was difficult to open on the ground.
Subtask 32-31-00-810-119-A
A. Procedure
(1) Do the detailed inspection of the RH MLG door retraction system components AMM 32-31-00-200-003 and AMM 32-31-00-210-002.
(2) Do a check of the RH MLG door clearance AMM 32-12-11-400-001.
(3) Do the detailed inspection of the RH MLG door uplock unit and rollers AMM 32-31-00-200-001.
(4) Do the detailed inspection of the RH MLG door forward and aft fittings AMM 52-81-00-200-001.
(5) Correct all the faults that you find.
(6) Do the Functional Test of the Normal Extension and Retraction System AMM 32-31-00-720-002.
(7) If the MLG doors close in the correct time but do not uplock:
(a) Replace the UPLOCK ASSY-MLG DOOR, R [2520GM] AMM 32-31-33-000-001 and AMM 32-31-33-400-002.
(8) If the fault continues:
(a) Operate the MLG doors 10 times. Use the Ground Door Opening handle AMM 32-12-00-710-002.
(a) Replace the2522GM AMM 32-31-35-000-001 and AMM 32-31-35-000-001.
(10) If the fault continues:
(a) Replace the BYPASS VALVE-MLG DOOR GROUND OPENING, R [2518GM] AMM 32-31-13-000-001 and AMM 32-31-13-400-001.
(11) If the fault continues:
(a) Replace the [41GA] AMM 32-31-34-000-001 and AMM 32-31-34-400-001.
(b) Replace the MANIFOLD ASSY-L/G AND DOOR SELECTOR VALVES [2524GM] AMM 32-31-31-000-001 and AMM 32-31-31-400-001.
(12) If the fault continues:
(a) Do the TSM task (Ref. TSM TASK 32-31-00-810-898).
5. Close-up(1) Do the detailed inspection of the RH MLG door retraction system components AMM 32-31-00-200-003 and AMM 32-31-00-210-002.
(2) Do a check of the RH MLG door clearance AMM 32-12-11-400-001.
(3) Do the detailed inspection of the RH MLG door uplock unit and rollers AMM 32-31-00-200-001.
(4) Do the detailed inspection of the RH MLG door forward and aft fittings AMM 52-81-00-200-001.
(5) Correct all the faults that you find.
(6) Do the Functional Test of the Normal Extension and Retraction System AMM 32-31-00-720-002.
(7) If the MLG doors close in the correct time but do not uplock:
(a) Replace the UPLOCK ASSY-MLG DOOR, R [2520GM] AMM 32-31-33-000-001 and AMM 32-31-33-400-002.
(8) If the fault continues:
(a) Operate the MLG doors 10 times. Use the Ground Door Opening handle AMM 32-12-00-710-002.
NOTE: This will bleed the door open/close hydraulic system.
(9) If the fault continues:(a) Replace the
(10) If the fault continues:
(a) Replace the BYPASS VALVE-MLG DOOR GROUND OPENING, R [2518GM] AMM 32-31-13-000-001 and AMM 32-31-13-400-001.
(11) If the fault continues:
(a) Replace the
(b) Replace the MANIFOLD ASSY-L/G AND DOOR SELECTOR VALVES [2524GM] AMM 32-31-31-000-001 and AMM 32-31-31-400-001.
(12) If the fault continues:
(a) Do the TSM task (Ref. TSM TASK 32-31-00-810-898).
Subtask 32-31-00-942-061-A
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tools and other items.
(1) Make sure that the work area is clean and clear of tools and other items.