Installation of the Starter Shutoff Valve [CFMI]
TASK 80-11-20-400-001-A
Installation of the Starter Shutoff Valve
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 80-11-20-860-050-A ** ON A/C NOT FOR ALL
Subtask 80-11-20-420-050-A ** ON A/C NOT FOR ALL
Subtask 80-11-20-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 03:44:08 UTC
Installation of the Starter Shutoff Valve
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 80 and 70 lbf.in (0.90 and 0.79 m.daN ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2101) | graphite grease |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-00-00-710-001-A | Dry Motoring Check |
| TASK 71-13-00-010-040-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-A | Closing of the Fan Cowl Doors |
Subtask 80-11-20-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) On the AIR COND panel 30VU:
Subtask 80-11-20-010-053-A ** ON A/C NOT FOR ALL WARNING:
IF IT IS NECESSARY TO ENERGIZE THE AIRCRAFT FOR A MAINTENANCE WORK WHILE YOU DO THIS MAINTENANCE PROCEDURE, MAKE SURE THAT ONLY EXTERNAL POWER IS USED. THE USE OF APU OR ENGINE POWER CAN CAUSE PRESSURIZED AIR LEAKAGE IN THE PNEUMATIC SYSTEM, AND INJURY CAN OCCUR.
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine. (2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) On the AIR COND panel 30VU:
- make sure that the APU BLEED pushbutton switch is released (ON legend is off),
- make sure that a WARNING NOTICE(S) is in position to tell persons not to operate the pneumatic system.
- make sure that a WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
B. Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-040)
(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 80-11-20-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Starter Shutoff Valve:
(1) Remove the blanking caps from the upper and lower ducts and the starter shutoff valve.
(2) Remove the blanking plugs from the electrical connectors.
(3) Clean the mating faces of the upper and lower ducts and starter shutoff valve.
(4) Install the starter shutoff valve (30) between the upper duct (10) flange and the lower duct (70) flange.
PRE SB 80-0015
(b) Make sure that the valve indexing slot is aligned with the lug of the upper duct (10).
END OF PRE SB 80-0015
(5) Installation of the V-clamps (20) and (60):
(b) Put the V-clamps in position on the starter shutoff valve (30) and the upper and lower ducts.
(6) Torque the V-clamp (20) and (60) nuts as follows:
.
(b) Tap the perimeter of the V-clamps with a fiber hammer and TORQUE again the nuts.
(c) Do this torque procedure two times.
(7) Connect the 2 electrical connectors (40 and 50) to the starter shutoff valve (30).
(8) Remove the lockwire and the tag from the handle of the starter shutoff valve.
Subtask 80-11-20-869-050-A ** ON A/C NOT FOR ALL (1) Remove the blanking caps from the upper and lower ducts and the starter shutoff valve.
(2) Remove the blanking plugs from the electrical connectors.
(3) Clean the mating faces of the upper and lower ducts and starter shutoff valve.
(4) Install the starter shutoff valve (30) between the upper duct (10) flange and the lower duct (70) flange.
CAUTION:
DURING INSTALLATION, ADJUST THE ORIENTATION OF THE LOWER DUCT. MAKE SURE THAT THE PS3 LINE DOES NOT TOUCH THE LOWER DUCT OR OTHER PARTS IN THIS AREA. IF IT DOES, CHAFING OF THE PS3 HOSE CAN OCCUR.
CAUTION:
DURING INSTALLATION, ADJUST THE ORIENTATION OF THE STARTER SHUTOFF VALVE. MAKE SURE THAT CLEARANCES BETWEEN STARTER SHUTOFF VALVE AND ENGINE FAN CASE AND BETWEEN IDG FEEDER CABLE AND STARTER SHUTOFF VALVE PART (THAT COULD BE THE ELECTRICAL CONNECTOR) ARE 0.30-0.35 IN. (7.6-8.9 MM) MINIMUM. ENGINE DAMAGE CAN OCCUR.
(a) Make sure that the flow arrow of the starter shutoff valve points to the starter. PRE SB 80-0015
(b) Make sure that the valve indexing slot is aligned with the lug of the upper duct (10).
END OF PRE SB 80-0015
(5) Installation of the V-clamps (20) and (60):
CAUTION:
MAKE SURE THAT THE V-CLAMP ATTACHMENTS CAN NOT TOUCH ENGINE COMPONENTS OR STRUCTURE, TO PREVENT DAMAGE.
(a) Lubricate V-clamp bolt threads with graphite grease (Material No.CP2101) . (b) Put the V-clamps in position on the starter shutoff valve (30) and the upper and lower ducts.
(6) Torque the V-clamp (20) and (60) nuts as follows:
CAUTION:
MAKE SURE THAT THE DUCTS ARE CORRECTLY CONNECTED WHEN YOU TORQUE THE COUPLINGS. IF THE DUCTS ARE NOT CORRECTLY CONNECTED THEY CAN LEAK AND CAUSE DAMAGE TO ADJACENT ELECTRICAL COMPONENTS.
(a) TORQUE the nuts to between 80 and 70 lbf.in (0.90 and 0.79 m.daN )
. (b) Tap the perimeter of the V-clamps with a fiber hammer and TORQUE again the nuts.
(c) Do this torque procedure two times.
(7) Connect the 2 electrical connectors (40 and 50) to the starter shutoff valve (30).
(8) Remove the lockwire and the tag from the handle of the starter shutoff valve.
B. Make sure that the work area is clean and clear of tools and other items.
Subtask 80-11-20-942-050-A ** ON A/C NOT FOR ALL C. Remove the WARNING NOTICE(S).
Subtask 80-11-20-710-050-A ** ON A/C NOT FOR ALL 5. Close-upSubtask 80-11-20-410-050-A ** ON A/C NOT FOR ALL
Removal/Installation of the Starter Shutoff Valve - PRE SB 80-0015