W DOC AIRBUS | AMM A320F

Installation of the Oil System Tubes and Hoses [CFMI]


TASK 79-20-00-400-001-A
Installation of the Oil System Tubes and Hoses


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 1M(3 FT)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 70 and 50 lbf.in (0.79 and 0.57 m.daN ) T
No specific
Torque wrench: range to between 100 and 90 lbf.in (1.13 and 1.02 m.daN ) T
No specific
Torque wrench: range to between 120 and 100 lbf.in (1.36 and 1.13 m.daN ) T
No specific
Torque wrench: range to between 135 and 125 lbf.in (1.53 and 1.41 m.daN ) T
No specific
Torque wrench: range to between 160 and 150 lbf.in (1.81 and 1.70 m.daN ) T
No specific
Torque wrench: range to between 180 and 155 lbf.in (2.03 and 1.75 m.daN ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.CP2242)
RTV 732
(Material No.CP8002)
lockwire 0.032 in. (0.8 mm) dia
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL
FOR [1000EM2] (ENGINE-2)
447AL
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
10
PACKING
AIPC 79-20-00-01-230
65
PACKING
AIPC 79-20-00-01-230
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-040-A
Opening of the Fan Cowl Doors
TASK 71-13-00-410-040-A
Closing of the Fan Cowl Doors
3. Job Set-up
Subtask 79-20-00-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
   (2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
Subtask 79-20-00-010-059-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Make sure that the left fan cowl doors is open (Ref. AMM TASK 71-13-00-010-040):
     (a) FOR [1000EM1] (ENGINE-1)
437AL
     (b) FOR [1000EM2] (ENGINE-2)
447AL
4. Procedure
Subtask 79-20-00-640-050-A ** ON A/C NOT FOR ALL Subtask 79-20-00-420-050-A ** ON A/C NOT FOR ALL Subtask 79-20-00-420-051-A ** ON A/C NOT FOR ALL
C. Installation of the Tee to Oil Tank Hose Assembly.
F Oil System Hose and Tubes ** ON A/C NOT FOR ALL
   (1) Remove the protective covers from the hose couplings, the tee and the oil tank.
   (2) Connect the hose assembly (95) to the oil tank and the tee (90).
   (3) TORQUE the couplings on the tube (95) to between 160 and 150 lbf.in (1.81 and 1.70 m.daN ) T.
NOTE: Use a second wrench to hold the tee and the union on the oil tank when you torque the coupling nuts on the hoses.
Subtask 79-20-00-420-052-A ** ON A/C NOT FOR ALL
D. Installation of the Oil Pressure Transmitter to Tee Tube Assembly.
F Oil System Hose and Tubes ** ON A/C NOT FOR ALL
   (1) Remove the protective covers from the tube, the tee and the oil pressure transmitter.
   (2) Connect the tube (115) to the tee (90).
   (3) Connect the tube (115) to the oil pressure transmitter (75).
   (4) TORQUE the coupling nuts on the tube (115) to between 160 and 150 lbf.in (1.81 and 1.70 m.daN ) T.
NOTE: Use a second wrench to hold the tee and the union on the oil pressure transmitter when you torque the coupling nuts on the tube.
   (5) Put the clamp (40) on the tube (115). Install the bolt (100), washer (110) and nut (10) that attach the clamp (40) to the other clamp (40) on the tube (125).
   (6) TORQUE the nut (10) to between 70 and 50 lbf.in (0.79 and 0.57 m.daN )
T.
Subtask 79-20-00-420-053-A ** ON A/C NOT FOR ALL Subtask 79-20-00-420-054-A ** ON A/C NOT FOR ALL Subtask 79-20-00-420-055-A ** ON A/C NOT FOR ALL
G. Installation of the Tee to Oil Pressure Transmitter Tube Assembly.
F Oil System Hose and Tubes ** ON A/C NOT FOR ALL
   (1) Remove the protective covers from the tube, the tee and the oil pressure transmitter.
   (2) Connect the tube (25) to the tee (20).
   (3) Connect the tube (25) to the oil pressure transmitter (75).
   (4) TORQUE the coupling nuts on the tube (25) to between 160 and 150 lbf.in (1.81 and 1.70 m.daN ) T.
NOTE: Use a second wrench to hold the tee and the union on the oil pressure transmitter when you torque the coupling nuts on the tube.
Subtask 79-20-00-420-056-A ** ON A/C NOT FOR ALL 5. Close-up
Subtask 79-20-00-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the left fan cowl door (
Ref. AMM TASK 71-13-00-410-040):
     (a) FOR [1000EM1] (ENGINE-1)
437AL
     (b) FOR [1000EM2] (ENGINE-2)
447AL
   (3) Remove the ACCESS PLATFORM 1M(3 FT)
   (4) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 03:37:49 UTC