W DOC AIRBUS | AMM A320F

Reactivation of the Cascade [CFML]


TASK 78-30-00-440-811-A
Reactivation of the Cascade


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
ZONE: 400
1. Reason for the Job
CDL 78-71
Thrust Reverser Cascade
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
400
POWER PLANT, NACELLES AND PYLONS
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 78-30-00-440-808-A
Reactivation of the Thrust Reverser System after Flight
TASK 78-32-43-400-806-A
Installation of the Thrust Reverser Cascades
3. Job Set-up
Subtask 78-30-00-941-099-A
A. Not Applicable
4. Procedure
CAUTION: ONLY ONE OF THE CASCADES CAN BE MISSING AT THE SAME TIME FROM EACH THRUST REVERSER COWL.
Subtask 78-30-00-420-058-A
A. Installation of the Thrust Reverser Cascade
   (1) Install the thrust reverser cascade no.1, no.2 and no.10 (Ref. AMM TASK 78-32-43-400-806).
Subtask 78-30-00-440-078-A
B. Reactivation of the Thrust Reverser after Flight
   (1) Reactivate the thrust reverser after flight (Ref. AMM TASK 78-30-00-440-808).
[Rev.10 from 2021] 2026.04.01 03:34:51 UTC