Removal of the CJ12L Harness [CFMB]
TASK 73-21-50-000-027-A-01
Removal of the CJ12L Harness
1. Reason for the Job
This TASK is applicable for /P, /3 and /3 PIP engines
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 73-21-50-941-097-A ** ON A/C NOT FOR ALL
Subtask 73-21-50-020-106-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:58:42 UTC
Removal of the CJ12L Harness
1. Reason for the Job
This TASK is applicable for /P, /3 and /3 PIP engines
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CAP - BLANKING |
| No specific | AR | PLIERS - CONNECTOR, JAW, SOFT |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-36-00-010-040-B | Opening of the Thrust Reverser Doors |
Subtask 73-21-50-941-097-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 73-21-50-010-168-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 73-21-50-040-127-A ** ON A/C NOT FOR ALL Subtask 73-21-50-010-169-A ** ON A/C NOT FOR ALL (1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
D. Open the left thrust reverser door (Ref. AMM TASK 78-36-00-010-040):
(1) FOR [1000EM1] (ENGINE-1)
451AL
(2) FOR [1000EM2] (ENGINE-2)
461AL
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
451AL
(2) FOR [1000EM2] (ENGINE-2)
461AL
Subtask 73-21-50-020-106-A ** ON A/C NOT FOR ALL
A. Removal of the CJ12L Harness
(1) Disconnect the CJ12L harness (10) from the VBV position sensor CH. B, the VSV position sensor CH. B and the TBV position sensor CH. B. Use PLIERS - CONNECTOR, JAW, SOFT only if necessary.
(2) Disconnect the HJ12 harness from the CJ12L bulkhead connector (150) in the 6 o'clock junction box. Use PLIERS - CONNECTOR, JAW, SOFT only if necessary.
(3) Cut and remove the lockwire which safeties the CJ11L, CJ12L and CJ13 bulkhead connector nuts together in the 6 o'clock junction box.
(4) Remove the nut (160) which attaches the bulkhead connector (150) to the 6 o'clock junction box (Detail B).
(5) Disengage the connector (150) from the 6 o'clock junction box.
(6) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(7) Remove the parts which attach the CJ12L harness (10) as follows:
(8) Remove the CJ12L harness (10) from the engine.
(1) Disconnect the CJ12L harness (10) from the VBV position sensor CH. B, the VSV position sensor CH. B and the TBV position sensor CH. B. Use PLIERS - CONNECTOR, JAW, SOFT only if necessary.
(2) Disconnect the HJ12 harness from the CJ12L bulkhead connector (150) in the 6 o'clock junction box. Use PLIERS - CONNECTOR, JAW, SOFT only if necessary.
(3) Cut and remove the lockwire which safeties the CJ11L, CJ12L and CJ13 bulkhead connector nuts together in the 6 o'clock junction box.
(4) Remove the nut (160) which attaches the bulkhead connector (150) to the 6 o'clock junction box (Detail B).
(5) Disengage the connector (150) from the 6 o'clock junction box.
(6) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(7) Remove the parts which attach the CJ12L harness (10) as follows:
| REMOVE | FROM | NOTE |
|---|---|---|
| Nut (70) Bolt (110) Clamp (120) | Bracket (90), clamps (80) and (100) on CJ11L harness | On the core engine, at the 7 o'clock position (Detail F) |
| Bolt (30) Clamp (20) | The fan frame | At the 7:45 o'clock position (Detail C) |
| Bolt (130) | Bracket (140) | On the fan frame, at the 8:30 o'clock position (Detail D) |
| Bolt (50) Clamp (40) | Bracket (60) | On the VBV fuel gear motor, at the 9 o'clock position (Detail E) |
| Clamps (20), (40) and (120) | CJ12L harness | (Details C, E and F) |
CJ12L Harness (/P, /3 and /3 PIP engines) SAC