Removal of the PS12 Line [CFMI]
TASK 72-23-00-000-006-A
Removal of the PS12 Line
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 72-23-00-941-067-A ** ON A/C NOT FOR ALL
Subtask 72-23-00-020-056-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 12:58:45 UTC
Removal of the PS12 Line
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-A | Opening of the Fan Cowl Doors |
| TASK 73-21-60-000-001-A | Removal of the Electronic Control Unit (ECU) |
Subtask 72-23-00-941-067-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 72-23-00-010-077-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
Subtask 72-23-00-020-070-A ** ON A/C NOT FOR ALL 4. Procedure(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-040):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
Subtask 72-23-00-020-056-A ** ON A/C NOT FOR ALL
A. Removal of the PS12 Line
(2) Disconnect the PS12 line from the fan frame nipples.
PRE SB 72-308
POST SB 72-338 (Configuration One)
(3) Remove the parts which attach the PS12 line to the engine as follows:
PRE SB 72-338
POST SB 72-308 (Configuration 2)
(4) Remove the parts which attach the PS12 line to the engine as follows:
END OF SB 72-308
END OF SB 72-338
(5) Remove the PS12 line from the engine.
CAUTION:
USE 2 WRENCHES TO REMOVE/INSTALL THE TUBE UNION NUT: ONE TO HOLD THE FITTING, THE OTHER TO LOOSE/TORQUE THE NUT. OTHERWISE, DAMAGE TO THE HARDWARE CAN OCCUR.
(1) Cut and remove the lockwire which secures the PS12 connections to the fan frame nipples. (2) Disconnect the PS12 line from the fan frame nipples.
PRE SB 72-308
POST SB 72-338 (Configuration One)
(3) Remove the parts which attach the PS12 line to the engine as follows:
| REMOVE | FROM | NOTE |
|---|---|---|
| Nuts (70) Bolts (10) Outer spring clips (20) Inner spring clips (40) Plastic bushings (30) | Brackets (50) and clamps (60) | On fan frame, from the 9 o'clock to the 7 o'clock positions (3 locations) (Detail E) |
| Nuts (110) Bolts (80) Outer spring clips (90) Inner spring clips (120) Plastic bushings (130) | Brackets (100) | On flange D, from the 9 o'clock to the 10 o'clock positions (14 locations) (Detail F) |
| Nut (170) Bolt (140) Outer spring clip (150) Inner spring clip (160) Plastic bushing (190) | Brackets (180) | On flange E, at the 4:30 o'clock position (Detail G) |
PRE SB 72-338
POST SB 72-308 (Configuration 2)
(4) Remove the parts which attach the PS12 line to the engine as follows:
| REMOVE | FROM | NOTE |
|---|---|---|
| Nut (230) Bolt (200) | Bracket (210) and clamp (220) | At the 7:30 o'clock position (Detail L) |
| Nuts (280) Bolts (240) Clamps (250) | Brackets (260) and clamps (270) | At the 8 o'clock and 8:30 o'clock positions (Detail M) |
| Nuts (310) Bolts (290) Clamps (300) | Brackets (320) | On flange D, from the 9 o'clock to the 3:30 o'clock positions (Detail N) (16 locations) |
| Nut (340) Bolt (330) | Bracket (350) | On flange D, at the 11:30 o'clock position (Detail P) |
| Nut (380) Bolt (360) | Bracket (370) | At the 4 o'clock position (Detail Q) |
| Nut (390) Bolt (410) Clamp (420) | Brackets (400) | On flange B, at the 4 o'clock position (Detail R) |
| Nut (450) Bolt (430) | Bracket (440) | On flange D, at the 4:30 o'clock position (Detail S) |
| Nut (490) Bolt (460) Clamp (470) | Bracket (480) | On flange E, at the 4:30 o'clock position (Detail T) |
END OF SB 72-308
END OF SB 72-338
(5) Remove the PS12 line from the engine.
PS12 Line (Configuration One)