W DOC AIRBUS | AMM A320F

Installation of the Platform Front Shroud [CFML]


TASK 72-21-60-400-801-A
Installation of the Platform Front Shroud


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 210
ZONE: 400
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 1M(3 FT)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 120.7 and 109.4 lbf.in (1.36 and 1.24 m.daN ) T
956A6067
1
SET, GUIDE PIN - PLATFORM FRONT SHROUD
956A6071G01
1
KEY, POSITIONER - FAN DISK BARREL NUT
956A6090G02
1
FIXTURE, REMOVE - PLATFORM FRONT SHROUD
956A8675
1
FIXTURE, INSTALL - PLATFORM FRONT SHROUD
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.CP2101)
graphite grease
(Material No.CP5070)
vaseline
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
400
POWER PLANT, NACELLES AND PYLONS
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
8
O-RING
EIPC 72-00-01-54-085
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 72-21-40-400-801-A
Installation of the Front Spinner
3. Job Set-up
Subtask 72-21-60-941-051-A
A. Safety Precautions
   (1) On the center pedestal, on ENG panel 115VU:
     (a) Make sure that the ENG/MODE selector switch is in the NORM position.
     (b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
     (c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
  • The ENG/MODE selector switch, and
  • The ENG/MASTER 1(2) control switch.
   (2) On the ENG section of maintenance panel 50VU:
     (a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
   (3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
4. Procedure
WARNING: BE CAREFUL WHEN YOU REMOVE OR INSTALL THE PLATFORM FRONT SHROUD. THE FAN BLADE PLATFORMS CAN FALL AND CAUSE DAMAGE TO THE EQUIPMENT OR INJURY TO THE PERSONNEL.
Subtask 72-21-60-420-050-A
A. Installation of the Platform Front Shroud
   (1) Make sure that the 956A7616 MAT, PROTECTION - INLET COWL (3) is installed on the inlet cowl.
   (2) Make sure that the mating surfaces are clean and clear of unwanted materials.
     (a) Lubricate the threads of the 18 bolts (7) with the graphite grease (Material No.CP2101) .
   (3) Install the 18 floating barrel retainers (11) on the 18 self-locking barrel nuts (10).
   (4) Install the 18 equipped self-locking barrel nuts (10) on the fan disk (5).
   (5) Check the correct position of the 18 equipped self-locking barrel nuts (10) with the 956A6071G01 KEY, POSITIONER - FAN DISK BARREL NUT (12).
   (6) Lubricate the new silicone EIPC 72-00-01-54-085 O-RING (8) with vaseline (Material No.CP5070) .
   (7) Install the silicone O-ring (8) in the groove of the fan blade platforms (4).
   (8) Install the 956A6067 SET, GUIDE PIN - PLATFORM FRONT SHROUD (13) on the fan disk (5).
   (9) Install the 956A6090G02 FIXTURE, REMOVE - PLATFORM FRONT SHROUD (6) on the platform front shroud (1).
NOTE: The tool shall not be installed into the offset hole.
   (10) Install the platform front shroud (1) in the correct position on the fan disk (5).
   (11) Install the six 956A8675 FIXTURE, INSTALL - PLATFORM FRONT SHROUD (14) on the platform front shroud (1).
   (12) Remove the 956A6090G02 FIXTURE, REMOVE - PLATFORM FRONT SHROUD (6) from the platform front shroud (1).
   (13) Install the platform front shroud (1) in correct position with the six 956A8675 FIXTURE, INSTALL - PLATFORM FRONT SHROUD (14) to manage the platform position.
   (14) Remove the 956A6067 SET, GUIDE PIN - PLATFORM FRONT SHROUD (13) from the fan disk (5).
   (15) Install the 12 bolts (7) to attach the platform front shroud (1) on the fan disk (5) and tighten by hand.
   (16) Remove the six 956A8675 FIXTURE, INSTALL - PLATFORM FRONT SHROUD (14) from the platform front shroud (1).
   (17) Install the six bolts (7) to attach the platform front shroud (1) on the fan disk (5) and tighten by hand.
   (18) TORQUE the 18 bolts (7) to between 120.7 and 109.4 lbf.in (1.36 and 1.24 m.daN ) T.
Subtask 72-21-60-420-052-A 5. Close-up
Subtask 72-21-60-942-050-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the access platform(s).
   (3) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 02:52:07 UTC