Installation of the Stage 1 Booster Vane Assembly [CFMB]
TASK 72-21-00-400-008-A
Installation of the Stage 1 Booster Vane Assembly
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Referenced Information
3. Job Set-up
Subtask 72-21-00-860-057-A ** ON A/C NOT FOR ALL
Subtask 72-21-00-480-059-A ** ON A/C NOT FOR ALL
Subtask 72-21-00-869-065-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 12:59:45 UTC
Installation of the Stage 1 Booster Vane Assembly
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | GUN - HOT AIR |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 110 and 100 lbf.in (1.24 and 1.13 m.daN ) ![]() | |
| 856A2916 | 1 | GUIDE PINS - BOOSTER VANE ASSY |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP1039) | acetone |
| (Material No.CP1041) | isopropyl alcohol |
| (Material No.CP2011) | stoddard solvent |
| (Material No.CP2101) | graphite grease |
| (Material No.CP2559) | ardrox 552 |
| (Material No.CP2560) | turco ind 79 |
| (Material No.CP2566) | mag-chem teksol |
| (Material No.CP2584) | degreasol 99 R |
| (Material No.CP2656) | mag-chem skysol |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 72-21-00-400-005-A | Installation of the Spinner Front Cone |
| TASK 72-21-00-400-006-A | Installation of the Spinner Rear Cone |
| TASK 72-21-00-400-007-A | Installation of the Fan Rotor Blades |
| TASK 72-23-00-400-028-A | Installation of the Splitter Fairing |
Subtask 72-21-00-860-057-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
4. Procedure(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
Subtask 72-21-00-480-059-A ** ON A/C NOT FOR ALL
A. Install the 3 guide pins, 856A2916 GUIDE PINS - BOOSTER VANE ASSY (856A2916G01), equally spaced on the stage 2 booster vane assembly.
Subtask 72-21-00-110-053-A ** ON A/C NOT FOR ALL B. Clean the Mating Faces:
(1) Thoroughly clean the mating faces of the stage 1 and stage 2 booster vane assemblies with acetone (Material No.CP1039) or stoddard solvent (Material No.CP2011) or ardrox 552 (Material No.CP2559) or turco ind 79 (Material No.CP2560) or mag-chem teksol (Material No.CP2566) or degreasol 99 R (Material No.CP2584) or mag-chem skysol (Material No.CP2656) or isopropyl alcohol (Material No.CP1041) .
Subtask 72-21-00-420-069-A ** ON A/C NOT FOR ALL (1) Thoroughly clean the mating faces of the stage 1 and stage 2 booster vane assemblies with acetone (Material No.CP1039) or stoddard solvent (Material No.CP2011) or ardrox 552 (Material No.CP2559) or turco ind 79 (Material No.CP2560) or mag-chem teksol (Material No.CP2566) or degreasol 99 R (Material No.CP2584) or mag-chem skysol (Material No.CP2656) or isopropyl alcohol (Material No.CP1041) .
C. Preparation and Installation of the Stage 1 Booster Vane Assembly:
(1) Increase the temperature of the rear flange of the stage 1 booster vane assembly to between 75 deg.C (167.00 deg.F) and 85 deg.C (185.00 deg.F) with a GUN - HOT AIR.
(2) Install the stage 1 booster vane assembly
Subtask 72-21-00-080-054-A ** ON A/C NOT FOR ALL (1) Increase the temperature of the rear flange of the stage 1 booster vane assembly to between 75 deg.C (167.00 deg.F) and 85 deg.C (185.00 deg.F) with a GUN - HOT AIR.
(2) Install the stage 1 booster vane assembly
WARNING:
USE THERMAL GLOVES WHEN YOU MOVE OR TOUCH HOT OR COLD PARTS. HOT OR COLD PARTS CAN CAUSE INJURY.
(a) Align the offset holes and use the 3 guide pins, to install the stage 1 booster vane assembly on the booster assembly. D. Remove 856A2916 GUIDE PINS - BOOSTER VANE ASSY (856A2916G01), apply a thin layer of graphite grease (Material No.CP2101) on the threads of bolts and seat the stage 1 booster vane assembly with 24 bolts.
Subtask 72-21-00-220-053-A ** ON A/C NOT FOR ALL E. Do a check of the seating of the stage 1 booster vane assembly on the stage 2 booster vane assembly with 0.001 in. (0.02 mm) feeler gage.
Subtask 72-21-00-420-074-A ** ON A/C NOT FOR ALL F. Install the Fan Components:
(1) Let the parts return to ambient temperature and TORQUE the bolts to between 110 and 100 lbf.in (1.24 and 1.13 m.daN )
.
(2) Install the splitter fairing (Ref. AMM TASK 72-23-00-400-028).
(3) Install all the fan blades (Ref. AMM TASK 72-21-00-400-007).
(4) Install the spinner rear cone (Ref. AMM TASK 72-21-00-400-006).
(5) Install the spinner front cone (Ref. AMM TASK 72-21-00-400-005).
5. Close-up(1) Let the parts return to ambient temperature and TORQUE the bolts to between 110 and 100 lbf.in (1.24 and 1.13 m.daN )
.(2) Install the splitter fairing (Ref. AMM TASK 72-23-00-400-028).
(3) Install all the fan blades (Ref. AMM TASK 72-21-00-400-007).
(4) Install the spinner rear cone (Ref. AMM TASK 72-21-00-400-006).
(5) Install the spinner front cone (Ref. AMM TASK 72-21-00-400-005).
Subtask 72-21-00-869-065-A ** ON A/C NOT FOR ALL
A. Make sure that the work area is clean and clear of tools and other items.
Subtask 72-21-00-942-064-A ** ON A/C NOT FOR ALL B. Remove the WARNING NOTICE(S).
Stage 1 Booster Vane Assembly