Installation of the Splitter Fairing [CFMB]
TASK 72-23-00-400-028-A
Installation of the Splitter Fairing
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Referenced Information
3. Job Set-up
Subtask 72-23-00-860-063-A ** ON A/C NOT FOR ALL
Subtask 72-23-00-420-064-A ** ON A/C NOT FOR ALL
Subtask 72-23-00-410-081-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:41:38 UTC
Installation of the Splitter Fairing
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP1039) | acetone |
| (Material No.CP1041) | isopropyl alcohol |
| (Material No.CP2011) | stoddard solvent |
| (Material No.CP2101) | graphite grease |
| (Material No.CP2559) | ardrox 552 |
| (Material No.CP2560) | turco ind 79 |
| (Material No.CP2566) | mag-chem teksol |
| (Material No.CP2584) | degreasol 99 R |
| (Material No.CP2656) | mag-chem skysol |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 72-21-00-400-005-A | Installation of the Spinner Front Cone |
| TASK 72-21-00-400-006-A | Installation of the Spinner Rear Cone |
| TASK 72-21-00-400-007-A | Installation of the Fan Rotor Blades |
Subtask 72-23-00-860-063-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
4. Procedure(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(3) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 72-23-00-420-064-A ** ON A/C NOT FOR ALL
A. Installation of the splitter fairing
(2) Clean the mating surfaces:
(a) Fully clean the mating surfaces of the splitter fairing front flange with acetone (Material No.CP1039) or isopropyl alcohol (Material No.CP1041) or stoddard solvent (Material No.CP2011) or ardrox 552 (Material No.CP2559) or turco ind 79 (Material No.CP2560) or mag-chem teksol (Material No.CP2566) or degreasol 99 R (Material No.CP2584) or mag-chem skysol (Material No.CP2656) .
(3) Put the splitter fairing (10) on the inner shroud of the fan outlet guide vane (OGV) assembly and on the outer shroud of the stage 1 vane assembly.
(4) Heat the front flange of the splitter fairing with a GUN - HOT AIR to approximately 140 deg.F (60 deg.C) until it can be fully engaged in the OGV inner shroud rabbet diameter.
(5) Lubricate the threads of the countersunk head screws (20) with graphite grease (Material No.CP2101) .
(6) Install screws (20). TORQUE to between 45 and 40 lbf.in (0.51 and 0.45 m.daN )
.
(7) Remove the rubber mat from the fan inlet case.
5. Close-upCAUTION:
INSTALL A RUBBER MAT IN THE FAN INLET CASE TO PREVENT DAMAGE TO THE ACOUSTICAL PANELS.
(1) Install a MAT - RUBBER in the fan inlet case. (2) Clean the mating surfaces:
(a) Fully clean the mating surfaces of the splitter fairing front flange with acetone (Material No.CP1039) or isopropyl alcohol (Material No.CP1041) or stoddard solvent (Material No.CP2011) or ardrox 552 (Material No.CP2559) or turco ind 79 (Material No.CP2560) or mag-chem teksol (Material No.CP2566) or degreasol 99 R (Material No.CP2584) or mag-chem skysol (Material No.CP2656) .
(3) Put the splitter fairing (10) on the inner shroud of the fan outlet guide vane (OGV) assembly and on the outer shroud of the stage 1 vane assembly.
(4) Heat the front flange of the splitter fairing with a GUN - HOT AIR to approximately 140 deg.F (60 deg.C) until it can be fully engaged in the OGV inner shroud rabbet diameter.
(5) Lubricate the threads of the countersunk head screws (20) with graphite grease (Material No.CP2101) .
(6) Install screws (20). TORQUE to between 45 and 40 lbf.in (0.51 and 0.45 m.daN )
. (7) Remove the rubber mat from the fan inlet case.
Subtask 72-23-00-410-081-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Installation of the Fan Blades, the Spinner Rear Cone and the Spinner Front Cone.
(2) Install the fan rotor blades (Ref. AMM TASK 72-21-00-400-007).
(3) Install the spinner rear cone (Ref. AMM TASK 72-21-00-400-006).
(4) Install the spinner front cone (Ref. AMM TASK 72-21-00-400-005).
(5) Make sure that the work area is clean and clear of tools and other items.
(6) Remove the access platform(s).
(7) Remove the WARNING NOTICE(S).
(1) Installation of the Fan Blades, the Spinner Rear Cone and the Spinner Front Cone.
(2) Install the fan rotor blades (Ref. AMM TASK 72-21-00-400-007).
(3) Install the spinner rear cone (Ref. AMM TASK 72-21-00-400-006).
(4) Install the spinner front cone (Ref. AMM TASK 72-21-00-400-005).
(5) Make sure that the work area is clean and clear of tools and other items.
(6) Remove the access platform(s).
(7) Remove the WARNING NOTICE(S).
Splitter Fairing