W DOC AIRBUS | AMM A320F

Removal of the Fuel Overboard Drain Tube [CFMI]


TASK 71-73-49-000-044-A
Removal of the Fuel Overboard Drain Tube


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CONTAINER 1 L (1/4 USGAL)
No specific
AR
COVER - PROTECTION
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-040-A
Opening of the Fan Cowl Doors
3. Job Set-up
Subtask 71-73-49-941-075-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) On the center pedestal, on the ENG panel 115VU:
     (a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
   (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
   (3) On the overhead maintenance panel 50VU:
     (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 71-73-49-010-092-A ** ON A/C NOT FOR ALL
B. Open the fan cowl doors: (Ref. AMM TASK 71-13-00-010-040)
   (1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
   (2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
4. Procedure
Subtask 71-73-49-020-075-A ** ON A/C NOT FOR ALL
A. Removal of the Fuel Overboard Drain-Tube.
   (1) Put a CONTAINER 1 L (1/4 USGAL) below the overboard drain tube to catch any fluid remaining in the tube.
   (2) Disconnect the overboard drain tube (70) from the engine tube and allow the fluid to drain.

PRE SB RA32071-13

   (3) Remove the clamp (5), the screw (60), the washer (15), the spacer (65), and the nut (20) that attach the tube (70) to the tube (55).

POST SB RA32071-13

   (4) Remove the clamp (5), the screw (60), the washer (15), the spacer (65), and the nut (20) that attach the tube (70) to the tube (55).
   (5) Remove the bolt (100), the washer (15), and the nut (20) that attach the tube (70) to the transfer gearbox bracket.

END SB RA32071-13

   (6) Remove the fuel overboard drain tube (70) from the engine.
   (7) Put COVER - PROTECTION on the engine tube and the overboard drain tube (70).
   (8) Remove the container from below the drain mast.
[Rev.10 from 2021] 2026.04.01 02:23:55 UTC