W DOC AIRBUS | AMM A320F

Removal of the Generator Power Harness 238W0903 [CFMI]


TASK 71-51-44-000-001-A
Removal of the Generator Power Harness 238W0903


FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 1M(3 FT)
No specific
AR
COVER - PROTECTION
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-040-A
Opening of the Fan Cowl Doors
3. Job Set-up
Subtask 71-51-44-941-050-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) On the center pedestal, on the ENG panel 115VU:
     (a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
   (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
   (3) On the overhead maintenance panel 50VU:
     (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 71-51-44-865-050-A ** ON A/C NOT FOR ALL
WARNING: OPEN THE PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3) BEFORE ENG1(2)FADEC A and EIU 1(2) C/B'S 2KS1 AND 2KS2. IF YOU DO NOT OBEY THIS SEQUENCE:
  • THE PROBES WILL BECOME TOO HOT.
  • THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
49VUANTI ICE/PROBES/AOA/14DA1D04
49VUANTI ICE/PROBES/PITOT/13DA1D02
49VUCOM/CVR/SPLY2RKE14
49VUCOM/CVR/CTL4RKE13
121VURCDR/DFDR7TUK16
121VUHYDRAULIC/HYD POWER/Y3803GXN30
122VUANTI ICE/WINDOWS/R4DG2W14
122VUANTI ICE/WINDOWS/L4DG1X14
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
FOR FIN: 1000EM1 (ENGINE1)
49VUENGINE/1/FIRE DET/LOOP A7WD1A06
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUENGINE/IGN/ENG1/SYS A BAT2JH1P39
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
121VUENGINE/ENG1/FIRE DET/LOOP B8WD1Q38
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R41
122VUELEC/GCU/12XU1T26
FOR FIN: 1000EM2 (ENGINE2)
49VUENGINE/2/FIRE DET/LOOP B8WD2A07
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG2/SYS A BAT2JH2P40
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE2Q42
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q41
121VUENGINE/ENG2/FADEC B4KS2Q40
121VUENGINE/ENG2/FIRE DET/LOOP A7WD2Q39
122VUELEC/GCU/22XU2T27
Subtask 71-51-44-010-050-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Open the fan cowl door (Ref. AMM TASK 71-13-00-010-040):
     (a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
   (2) Put the ACCESS PLATFORM 1M(3 FT) in position.
4. Procedure
Subtask 71-51-44-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Generator Power Harness 238W0903
NOTE: To open the flip-lock clamps turn the captive screws 1/4 turn counterclockwise to disengage the cam nuts.
NOTE: Make sure you loosely install the hardware in the correct location after you remove the harness from the clamps and line blocks.
   (1) Disconnect electrical connector 400VC-A from the pylon junction box.
   (2) Open the seven flip-lock clamps (10) and remove the electrical harness (5) from the rubber inserts.
   (3) Remove the nut (30), the lockwasher (25), the bolt (15) and the washer (20) that attach the ground cables to the ground plate.
   (4) Remove the screw (105), the washer (100) and the nut (115) that attach the clamp (110) to the bracket (85).
   (5) Remove the bolt (95), the washers (90) and (75) and the nut (70) that attach the bracket (85) to the line block (80).
   (6) Remove the screws (35) that attach the cover (40) to the integrated drive generator (IDG) terminal. Remove the cover.
   (7) Identify the ground cables (60), (65), (120) and (125) with a tag before you remove them from the terminal studs.
   (8) Remove the nuts (45), the lockwashers (50), and the washers (55) that attach the ground cables (60), (65), (120) and (125) to the ground studs.
   (9) Remove the electrical harness (5) from the engine.
   (10) Put COVER - PROTECTION on the harness and the pylon junction box connectors.