W DOC AIRBUS | AMM A320F

Installation of the Forward Engine Mount [IAE]


TASK 71-21-12-400-011-A
Installation of the Forward Engine Mount


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: THIS PART IS A REMOVABLE STRUCTURAL COMPONENT (RSC), WHICH CAN BE MOVED BETWEEN AIRCRAFT. THUS IT CAN HAVE DIFFERENT OPERATION CONDITIONS AND A DIFFERENT LIFE RECORD (FLIGHT HOURS/FLIGHT CYCLES/CALENDAR) FROM THE AIRCRAFT IT IS INSTALLED ON OR REMOVED FROM. THE OPERATOR IS RESPONSIBLE FOR THE SPECIFIC TRACKING AND CONTINUED AIRWORTHINESS OF REMOVABLE STRUCTURAL COMPONENTS. INCORRECT MAINTENANCE OF THESE COMPONENTS CAN CAUSE A RISK FOR THE FLIGHT SAFETY.
ZONE: 400
FIN: 1500KM ** ON A/C NOT FOR ALL
1. Reason for the Job
This TASK supplies the data to install the Forward engine mount.
NOTE: For interchangeability see Goodrich AOL-V2500-09-002.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 46 and 42 lbf.ft (6.24 and 5.69 m.daN ) T
No specific
Torque wrench: range to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) T
IAE1N20014
1
SLING, FWD MOUNT
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.V02-156)
lockwire
(Material No.V02-272)
safety cable kit
(Material No.V02-273)
safety cable kit
(Material No.V02-274)
safety cable kit
(Material No.V02-275)
safety cable kit
(Material No.V02-276)
safety cable kit
(Material No.V02-277)
safety cable kit
(Material No.V02-278)
safety cable kit
(Material No.V02-279)
safety cable kit
(Material No.V02-280)
safety cable ferrule
(Material No.V02-281)
safety cable ferrule
(Material No.V10-077)
lubricant (engine oil)
(Material No.V10-078)
anti-seize compound
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
400
POWER PLANT, NACELLES AND PYLONS
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 70-23-11-911-013-A
General Torque Tightening Techniques
TASK 70-40-11-911-014-A
Locking Devices General Information
TASK 70-40-11-911-016-A
General Instructions for Uses of Safety Cable
TASK 71-00-20-400-040-A
Installation of the Power Plant
TASK 71-00-20-400-040-A-01
Installation of the Power Plant with the Engine Positioner TWW 75E (MIAG)
3. Job Set-up
Subtask 71-21-12-410-063-A ** ON A/C NOT FOR ALL
A. Attach the forward mount sling and mounting plate
F Forward Engine Mount ** ON A/C NOT FOR ALL
   (1) Attach the IAE1N20014 SLING, FWD MOUNT (16) to a hoist and position over the forward engine mount (1).
   (2) Remove the four nuts and two washers from the mounting plate.
   (3) Position the sling mounting plate on the forward engine mount (1) and insert the four bolts through the side holes. Make sure the plate is aligned properly.
   (4) Place two washers and two nuts on the rear bolts and nuts only on the front bolts. Tighten the nuts.
   (5) Raise the hoist to straighten the sling.
4. Procedure
Subtask 71-21-12-410-064-A ** ON A/C NOT FOR ALL
A. Install the forward engine mount
F Forward Engine Mount ** ON A/C NOT FOR ALL
   (1) Put the forward engine mount (1) in position on the engine.
   (2) Lubricate the threads of the bolts (15) with V10-077lubricant (engine oil).
   (3) Attach the forward engine mount (1) to the engine mount tube with bolts (15) and washers (14).
     (a) Make sure that you install the monoball stop flange on top.
     (b) Make sure that you follow the installation hole pattern.
   (4) TORQUE the bolts (15) to between 46 and 42 lbf.ft (6.24 and 5.69 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
   (5) Installation of the safety cable.
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
     (a) Install safety cable kit (Material No.V02-275) (Ref. AMM TASK 70-40-11-911-016) on bolts (15).
Alternate: Use lockwire (Material No.V02-156) (Ref. AMM TASK 70-40-11-911-014), safety cable kit (Material No.V02-272) , safety cable kit (Material No.V02-273) , safety cable kit (Material No.V02-274) , safety cable kit (Material No.V02-276) , safety cable kit (Material No.V02-277) , safety cable kit (Material No.V02-278) ,
safety cable kit (Material No.V02-279) , safety cable ferrule (Material No.V02-280) or safety cable ferrule (Material No.V02-281) (Ref. AMM TASK 70-40-11-911-016).
   (6) Locate the link assemblies (4) on the engine brackets.
   (7) Apply anti-seize compound (Material No.V10-078) to the pins (12).
   (8) Install the pins (12) in the link assemblies (4).
   (9) Install the retainers (11) and (13) through the ends of the pins (12).
   (10) Install the bolts (2) and (10), washers (3), (6), (7) and (9) and nuts (5) and (8) that attach the retainers (11) and (13) to the engine bracket.
   (11) TORQUE the nuts (5) and (8) to between 25 and 20 lbf.in (0.28 and 0.23 m.daN ) T (Ref. AMM TASK 70-23-11-911-013).
     (a) Apply torque stripe to the nuts (5) and (8).
5. Close-up
Subtask 71-21-12-420-054-A ** ON A/C NOT FOR ALL
A. Install the Power Plant
   (1) Installation of the power plant (Ref. AMM TASK 71-00-20-400-040).
Subtask 71-21-12-410-065-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 02:30:16 UTC