W DOC AIRBUS | AMM A320F

Clean and Examine the Power Plant [IAE]


TASK 71-00-00-100-010-A
Clean and Examine the Power Plant


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING: YOU MUST NOT TOUCH HOT PARTS WITHOUT APPLICABLE GLOVES. HOT PARTS CAN CAUSE AN INJURY.
1. Reason for the Job
This task gives the procedure to clean and examine the power plant before the application preservation procedures are done.
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 70-11-50-100-010-A
Remove Grease from the External Surfaces of the Engine
3. Job Set-up
Subtask 71-00-00-941-100-A ** ON A/C NOT FOR ALL
A. Not Applicable
4. Procedure
Subtask 71-00-00-110-054-A ** ON A/C NOT FOR ALL
A. Clean the engine
   (1) Clean and flush the engine, nose cowl, fan cowls, thrust reverser halves and common nozzle assembly externally (Ref. AMM TASK 70-11-50-100-010).
   (2) Examine the engine, nose cowl, fan cowls, thrust reverser halves and common nozzle assembly externally for corrosion and damage to the surface protection. Remove corrosion and repair damage to the surface protection as necessary.
5. Close-up
Subtask 71-00-00-942-065-A ** ON A/C NOT FOR ALL
A. Not Applicable