Installation of the Navigation-Light Glazing Panel
TASK 57-37-12-400-802-A
Installation of the Navigation-Light Glazing Panel
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Referenced Information
3. Job Set-up
Subtask 57-37-12-941-054-A ** ON A/C NOT FOR ALL
Subtask 57-37-12-420-052-D ** ON A/C NOT FOR ALL
Subtask 57-37-12-865-055-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:12:27 UTC
Installation of the Navigation-Light Glazing Panel
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 4M (13 FT) |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 0.9 and 0.8 m.daN (79.65 and 70.80 lbf.in ) ![]() | |
| 98D27803500001 | 1 | LOCKING TOOL ZERO POS |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05RAB9) | Adhesive Film Tape-- Aluminium Foil - |
| (Material No.06AFB1) | Polysulfide Sealant-Windshield Fillet - |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| (Material No.08ABC1) | Aqueous Cleaner-Aircraft Exterior Pressure Spraying - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.08BBE1) | Non Aqueous Cleaner-- Methyl Alcohol - |
| (Material No.14DAB1) | Release Agent-- Water Base - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 33-41-00-040-001-A | Deactivation of the Glazing Panel of the Wing-Tip Navigation Light |
| TASK 33-41-00-710-001-A | Operational Test of the Navigation Lights |
| SRM 517611 | |
Subtask 57-37-12-941-054-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) Make sure that the 98D27803500001 LOCKING TOOL ZERO POS is installed on the flap/slat control lever.
(2) Make sure that the WARNING NOTICE(S) are in position in the cockpit to tell persons not to operate the flaps or slats.
(3) Make sure that the SAFETY BARRIER(S) are in position.
Subtask 57-37-12-860-051-A ** ON A/C NOT FOR ALL (1) Make sure that the 98D27803500001 LOCKING TOOL ZERO POS is installed on the flap/slat control lever.
(2) Make sure that the WARNING NOTICE(S) are in position in the cockpit to tell persons not to operate the flaps or slats.
(3) Make sure that the SAFETY BARRIER(S) are in position.
B. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 4M (13 FT) is in position below the applicable zone 534 (634).
Subtask 57-37-12-865-054-A ** ON A/C NOT FOR ALL (1) Make sure that the ACCESS PLATFORM 4M (13 FT) is in position below the applicable zone 534 (634).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | LIGHTING/EXT LT/NAV1/AND LOGO/LT | 1LA | T03 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | LIGHTING/EXT LT/NAV2/AND LOGO/LT | 2LA | T02 |
| 122VU | LIGHTING/WING/STROBE | 10LV | V05 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | LIGHT/EXT LT NAV1/AND LOGO/LT | 1LA | T03 |
Subtask 57-37-12-420-052-D ** ON A/C NOT FOR ALL
A. Preparation for Installation
(2) If there is a crack in the glazing panel, or it is broken:
(4) Apply a bead of Polysulfide Sealant-Windshield Fillet - (Material No.06AFB1) to the aircraft structure/component interface.
(5) Clean the glazed area of the glazing panel (5) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-- Methyl Alcohol - (Material No.08BBE1) or Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) and water.
Subtask 57-37-12-420-053-D ** ON A/C NOT FOR ALL CAUTION:
USE THE SOLVENTS CAREFULLY. DO NOT LET THE SOLVENTS TOUCH THE GLAZING.
(1) Do an inspection of the aircraft structure/component interface. Make sure that the sealant interfay is in good condition. (2) If there is a crack in the glazing panel, or it is broken:
- Deactivate the glazing panel (Ref. AMM TASK 33-41-00-040-001).
(4) Apply a bead of Polysulfide Sealant-Windshield Fillet - (Material No.06AFB1) to the aircraft structure/component interface.
(5) Clean the glazed area of the glazing panel (5) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-- Methyl Alcohol - (Material No.08BBE1) or Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) and water.
B. Installation of the Navigation-Light Glazing Panel
(1) Apply Release Agent-- Water Base - (Material No.14DAB1) to the inner surface of the glazing panel (5).
(2) Put the glazing panel (5) in position.
(3) Install the bolts (4).
(4) TORQUE the bolts (4) to between 0.9 and 0.8 m.daN (79.65 and 70.80 lbf.in )
.
Subtask 57-37-12-420-052-E ** ON A/C NOT FOR ALL (1) Apply Release Agent-- Water Base - (Material No.14DAB1) to the inner surface of the glazing panel (5).
(2) Put the glazing panel (5) in position.
(3) Install the bolts (4).
(4) TORQUE the bolts (4) to between 0.9 and 0.8 m.daN (79.65 and 70.80 lbf.in )
. C. Preparation for Installation
(2) Clean the glazed area of the glazing panel (8) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-- Methyl Alcohol - (Material No.08BBE1) or Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) and water.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) If there is a crack in the glazing panel, or it is broken:
Subtask 57-37-12-420-053-F ** ON A/C NOT FOR ALL CAUTION:
USE THE SOLVENTS CAREFULLY. DO NOT LET THE SOLVENTS TOUCH THE GLAZING.
(1) Clean the component interfaces and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) . (2) Clean the glazed area of the glazing panel (8) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-- Methyl Alcohol - (Material No.08BBE1) or Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) and water.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) If there is a crack in the glazing panel, or it is broken:
- deactivate the glazing panel (Ref. AMM TASK 33-41-00-040-001).
D. Installation of the Navigation-Light Glazing Panel
(1) For installation of a glazing panel that was removed for access only:
(a) Put the glazing panel (8) with the seal (6) in position.
(b) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) under the head and to the shank of each bolt (7).
(c) Install the bolts (7).
(d) TORQUE the bolts (7) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in )
.
(2) For installation of a replacement glazing panel:
(a) Put the glazing panel (8) with the seal (6) in position.
1 Install four shorter bolts (7) at the outer locations in the upper and lower positions.
2 TORQUE the bolts (7) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in )
.
3 Look through the glazing panel (8) to see how many threads of each bolt (7) are through the anchor nut:
(c) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) under the head and to the shank of each bolt of the correct set (7).
(d) Install the correct set of bolts (7).
(e) TORQUE the bolts (7) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in )
.
Subtask 57-37-12-914-052-B ** ON A/C NOT FOR ALL (1) For installation of a glazing panel that was removed for access only:
(a) Put the glazing panel (8) with the seal (6) in position.
(b) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) under the head and to the shank of each bolt (7).
(c) Install the bolts (7).
(d) TORQUE the bolts (7) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in )
. (2) For installation of a replacement glazing panel:
(a) Put the glazing panel (8) with the seal (6) in position.
NOTE: Two complete sets of bolts (7) are supplied with the glazing panel (8). Make sure the correct set of bolts (7) is used.
(b) Find the correct set of bolts (7) to use to attach the glazing panel (8) as follows: 1 Install four shorter bolts (7) at the outer locations in the upper and lower positions.
2 TORQUE the bolts (7) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in )
. 3 Look through the glazing panel (8) to see how many threads of each bolt (7) are through the anchor nut:
- if more than 1.5 threads can be seen on each bolt (7), the complete set of shorter bolts must be used
- if less than 1.5 threads can be seen on any bolt (7), the complete set of longer bolts must be used.
(c) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) under the head and to the shank of each bolt of the correct set (7).
(d) Install the correct set of bolts (7).
(e) TORQUE the bolts (7) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in )
. E. Sealant Application
5 If the Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) is damaged, then:
7 Clean the component interfaces and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
8 Apply Polysulfide Sealant-Windshield Fillet - (Material No.06AFB1) to the space between the edge of the panel and the aircraft structure.
6 If the Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) is damaged, then:
8 Clean the area around the navigation-light glazing area with:
5. Close-upNOTE: If the sealant cure time is not sufficient before the aircraft flight, do step (2).
(1) Apply Polysulfide Sealant-Windshield Fillet - (Material No.06AFB1) to the space between the edge of the panel and the aircraft structure. NOTE: If necessary, refer to the SRM 517611 for the correct repair procedure to apply the sealant between the glazing and the glazing frame.
CAUTION:
WHEN YOU APPLY THE TAPE, MAKE SURE THAT THERE ARE NO BUBBLES. THIS WILL HELP TO PREVENT THE REMOVAL OF THE TAPE DURING FLIGHT.
(2) If the sealant cure time is not sufficient before the aircraft flight, do procedure (a) or (b) as necessary: - procedure (a), apply Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) between the glazing panel and the aircraft structure with no sealant applied
- procedure (b), apply Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) between the glazing panel and the aircraft structure while the applied sealant cures.
- between the edge of the glazing panel and the aircraft structure without the sealant as follows:
- on the glazing panel along the edge of the panel and the aircraft structure.
- around the glazing panel to make sure that the surface is smooth. The minimum overlap length of the applied Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) must be 25 mm (1 in.).
- is not applied on the glazing section of the assembly
- is not applied on the fillet seal around the glazing section
- does not effect the navigation light transmission.
5 If the Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) is damaged, then:
- replace the damaged Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9)
- do an operational test of the navigation lights (Ref. AMM TASK 33-41-00-710-001).
7 Clean the component interfaces and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
8 Apply Polysulfide Sealant-Windshield Fillet - (Material No.06AFB1) to the space between the edge of the panel and the aircraft structure.
NOTE: If necessary, refer to the SRM 517611 for the correct repair procedure to apply the sealant between the glazing and the glazing frame.
(b) Put Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) : - between the edge of the panel and the aircraft structure after the sealant is not tacky as follows:
CAUTION:
BEFORE YOU APPLY THE TAPE, MAKE SURE THAT THE SEALANT IS NOT TACKY. IF IT IS TACKY, THE TAPE CAN CAUSE DAMAGE TO THE SEALANT.
2 Put an applicable length strip of Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) : - on the glazing panel along the edge of the panel and the aircraft structure.
- around the glazing panel to make sure that the surface is smooth. The minimum overlap length of the applied Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) must be 25 mm (1 in.).
NOTE: The Polysulfide Sealant-Windshield Fillet - (Material No.06AFB1) is not tacky after 3 hours and the cure time is 4 hours.
NOTE: During the flight, temperatures are less than 10 deg.C (50 deg.F) and the sealants do not dry. The sealant cure time given above does not include flight hours.
4 Make sure that the Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) : - is not applied on the glazing section of the assembly
- is not applied on the fillet seal around the glazing section
- does not effect the navigation light transmission.
6 If the Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) is damaged, then:
- replace the damaged Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9)
- do an operational test of the navigation lights (Ref. AMM TASK 33-41-00-710-001).
8 Clean the area around the navigation-light glazing area with:
- a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-- Methyl Alcohol - (Material No.08BBE1) or Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) and water.
Subtask 57-37-12-865-055-A ** ON A/C NOT FOR ALL
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 57-37-12-942-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | LIGHTING/EXT LT/NAV1/AND LOGO/LT | 1LA | T03 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | LIGHTING/EXT LT/NAV2/AND LOGO/LT | 2LA | T02 |
| 122VU | LIGHTING/WING/STROBE | 10LV | V05 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | LIGHT/EXT LT NAV1/AND LOGO/LT | 1LA | T03 |
B. Remove the Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Remove the safety barriers.
(4) Remove the 98D27803500001 LOCKING TOOL ZERO POS from the flap/slat control lever.
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Remove the safety barriers.
(4) Remove the 98D27803500001 LOCKING TOOL ZERO POS from the flap/slat control lever.
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Navigation-Light Glazing Panel - Location and Detail