W DOC AIRBUS | AMM A320F

Installation of the Protective Cover of the ACT-Equipment Support Door


TASK 57-17-11-400-003-A
Installation of the Protective Cover of the ACT-Equipment Support Door


ZONE: 147
ZONE: 148
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
Torque wrench: range to between 0.42 and 0.38 m.daN (37.17 and 33.63 lbf.in ) T
No specific
Torque wrench: range to between 0.9 and 0.8 m.daN (79.65 and 70.80 lbf.in ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
147
MAIN GEAR WELL AND HYDRAULIC COMPARTMENT
148
MAIN GEAR WELL AND HYDRAULIC COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
3. Job Set-up
Subtask 57-17-11-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at zone 147 or 148.
   (2) Make sure that the MLG doors are open and the safety devices installed. (Ref. AMM TASK 32-12-00-010-001)
4. Procedure
Subtask 57-17-11-420-055-A ** ON A/C NOT FOR ALL
A. Installation of the Protective Cover
F Protective Cover ** ON A/C NOT FOR ALL
   (1) Put the protective cover (51) in position on the ACT-equipment support door (57).
   (2) Install the washers (53) and the screws (54).
   (3) TORQUE the screws (54) to between 0.9 and 0.8 m.daN (79.65 and 70.80 lbf.in ) T.
   (4) Do the electrical bonding when you install the bonding strip (56) (
Ref. AMM TASK 20-28-00-912-802).
   (5) Install the bonding strip (56), the washer (52) and the bolt (55).
   (6) TORQUE the bolt (55) to between 0.42 and 0.38 m.daN (37.17 and 33.63 lbf.in ) T.
5. Close-up
Subtask 57-17-11-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Remove the safety devices and close the MLG doors (
Ref. AMM TASK 32-12-00-410-001).
   (2) Make sure that the work area is clean and clear of tools and other items.
   (3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
   (4) Remove the access platform(s).
[Rev.10 from 2021] 2026.04.01 07:38:33 UTC