Installation of the Protective Cover of the ACT-Equipment Support Door
TASK 57-17-11-400-003-A
Installation of the Protective Cover of the ACT-Equipment Support Door
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 57-17-11-860-053-A ** ON A/C NOT FOR ALL
Subtask 57-17-11-420-055-A ** ON A/C NOT FOR ALL
Subtask 57-17-11-410-053-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 07:38:33 UTC
Installation of the Protective Cover of the ACT-Equipment Support Door
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 147 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| 148 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 57-17-11-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at zone 147 or 148.
(2) Make sure that the MLG doors are open and the safety devices installed. (Ref. AMM TASK 32-12-00-010-001)
4. Procedure(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at zone 147 or 148.
(2) Make sure that the MLG doors are open and the safety devices installed. (Ref. AMM TASK 32-12-00-010-001)
Subtask 57-17-11-420-055-A ** ON A/C NOT FOR ALL
A. Installation of the Protective Cover
(1) Put the protective cover (51) in position on the ACT-equipment support door (57).
(2) Install the washers (53) and the screws (54).
(3) TORQUE the screws (54) to between 0.9 and 0.8 m.daN (79.65 and 70.80 lbf.in )
.
(4) Do the electrical bonding when you install the bonding strip (56) (Ref. AMM TASK 20-28-00-912-802).
(5) Install the bonding strip (56), the washer (52) and the bolt (55).
(6) TORQUE the bolt (55) to between 0.42 and 0.38 m.daN (37.17 and 33.63 lbf.in )
.
5. Close-up(1) Put the protective cover (51) in position on the ACT-equipment support door (57).
(2) Install the washers (53) and the screws (54).
(3) TORQUE the screws (54) to between 0.9 and 0.8 m.daN (79.65 and 70.80 lbf.in )
. (4) Do the electrical bonding when you install the bonding strip (56) (Ref. AMM TASK 20-28-00-912-802).
(5) Install the bonding strip (56), the washer (52) and the bolt (55).
(6) TORQUE the bolt (55) to between 0.42 and 0.38 m.daN (37.17 and 33.63 lbf.in )
. Subtask 57-17-11-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Remove the safety devices and close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(4) Remove the access platform(s).
(1) Remove the safety devices and close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(4) Remove the access platform(s).
Protective Cover