Detailed Inspection of Vertical Stabilizer, Attach Fittings, Including Load Introduction Area at Skin Panels
TASK 55-36-00-210-001-A
Detailed Inspection of Vertical Stabilizer, Attach Fittings, Including Load Introduction Area at Skin Panels
Refer to the MPD TASK: 553004-01
DETAILED INSPECTION OF VERTICAL STABILIZER, ATTACH FITTINGS, INCLUDING LOAD INTRODUCTION AREA AT SKIN PANELS
2. Job Set-up Information
A. Consumable Materials
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 55-36-00-010-050-A
Subtask 55-36-00-210-050-A
Subtask 55-36-00-410-050-A
[Rev.10 from 2021]
2026.04.01 03:59:45 UTC
Detailed Inspection of Vertical Stabilizer, Attach Fittings, Including Load Introduction Area at Skin Panels
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobRefer to the MPD TASK: 553004-01
DETAILED INSPECTION OF VERTICAL STABILIZER, ATTACH FITTINGS, INCLUDING LOAD INTRODUCTION AREA AT SKIN PANELS
2. Job Set-up Information
A. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 320 | VERTICAL STABILIZER AND RUDDER |
| 323 | VERTICAL STABILIZER SPAR BOX |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 53-55-11-000-001-A | Removal of the Vertical Stabilizer Fairings |
| TASK 53-55-11-400-001-A | Installation of the Vertical Stabilizer Fairings |
| SRM 55310001 | (for corrective action) |
Subtask 55-36-00-010-050-A
A. Get Access
(1) Remove the fairings 323AL and 323AR (Ref. AMM TASK 53-55-11-000-001).
(2) Carefully clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
4. Procedure(1) Remove the fairings 323AL and 323AR (Ref. AMM TASK 53-55-11-000-001).
(2) Carefully clean the inspection area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
Subtask 55-36-00-210-050-A
A. Do a detailed visual inspection of the vertical stabilizer attach fittings including the load introduction area at the skin panels.
5. Close-upNOTE: If necessary, refer to the ASRM SRM 55310001 for the correct repair procedure.
Subtask 55-36-00-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the fairings 323AL and 323AR (Ref. AMM TASK 53-55-11-400-001).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the fairings 323AL and 323AR (Ref. AMM TASK 53-55-11-400-001).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Inspection Area