W DOC AIRBUS | AMM A320F

Installation of the Apron 333AT/333AB/343AT/343AB


TASK 55-15-11-400-001-A
Installation of the Apron 333AT/333AB/343AT/343AB


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 330
ZONE: 340
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
SCRAPER - NON METALLIC
No specific
1
SHIM - ALUMINUM OR PLASTIC
No specific
Torque wrench: range to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in ) T
No specific
Torque wrench: range to between 0.9 and 0.8 m.daN (79.65 and 70.80 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05EJL9)
Epoxy Adhesive-Metal to metal - Legacy
(Material No.06AEA1)
Polysulfide Sealant-Low Adhesion Brushable -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14DBB1)
Release Agent-- Liquid Wax -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
330
THS LH AND LH ELEVATOR
340
THS RH AND RH ELEVATOR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 27-44-00-710-002-A
Operational Test of the Trimmable Horizontal Stabilizer Actuator with the Individual Hydraulic Systems
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
SRM 55111102
(for corrective action)
3. Job Set-up
Subtask 55-15-11-865-053-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
49VUFLIGHT CONTROLS/THS/ACTR/MOT219CE2B09
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
49VUAUTO FLT/FAC1/28VDC5CC1B04
49VUAUTO FLT/FAC1/26VAC14CC1B03
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
49VUFLIGHT CONTROLS/THS/ACTR/MOT219CE2B04
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
49VUAUTO FLT/FAC1/28VDC5CC1H10
49VUAUTO FLT/FAC1/26VAC14CC1H09
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
105VUFLT CTL/SEC1/STBY SPLY22CEB01
121VUAUTO FLT/RUDDER/TRIM/IND15CCM20
121VUAUTO FLT/FAC2/28VDC5CC2M19
121VUAUTO FLT/FAC2/26VAC14CC2M18
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
121VUFLIGHT CONTROLS/THS ACTR/MOT319CE3Q17
121VUFLIGHT CONTROLS/THS ACTR/MOT119CE1Q16
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
Subtask 55-15-11-860-054-A
B. Aircraft Maintenance Configuration
   (1) Make sure that the hydraulic systems are depressurized and put them in the maintenance configuration
(Ref. AMM TASK 29-00-00-864-001)
   (2) Make sure that the access platform is in position at the trimmable horizontal stabilizer.
   (3) Make sure that the warning notices are in position in the cockpit to tell persons:
  • not to pressurize the hydraulic systems,
  • not to operate the flight controls.
4. Procedure
Subtask 55-15-11-320-050-A
A. Preparation of the Replacement Component
CAUTION: DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF CARBONFIBER REINFORCED PLASTIC.
   (1) Clean the mating surface of the THS with Non Aqueous Cleaner-General - - (Material No.08BAA9)
   (2) Remove the old sealant from the aprons (4), (9) with a SCRAPER - NON METALLIC and Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (3) Remove the screws (10), the cover strip (11), (12) and the seal (13), (14) from the removed apron (4), (9).
   (4) Clean the component interfaces and the adjacent area.
   (5) Do an inspection of the component interfaces and the adjacent area.
   (6) Do an inspection for correct condition of the nut-plates.
  • If necessary, do the Fairing Attachment Repair SRM 55111102.
Subtask 55-15-11-210-054-A
B. Preparation for Installation
NOTE: This procedure is applicable for an upper apron. The procedure for a lower apron is the same.
NOTE: This procedure is applicable for all aprons where shims are necessary for the installation.
   (1) Put the apron (4) in position.
   (2) Install the attachment screws (1), (2).
   (3) TORQUE the screws (1), (2) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in ) T in the correct sequence.
   (4) Measure the distance between the apron (4) and the fuselage surface.
  • The distance must be 2.5 +1.0 mm or -1.0 mm (0.0984 +0.0394 in. or -0.0394 in.).
   (5) Measure the distance between the apron (4) and the THS surface.
  • The distance must be 1.0 mm (0.0394 in.) maximum.
   (6) If the distance is more than 1.0 mm (0.0394 in.), you must install the apron (4) with a SHIM - ALUMINUM OR PLASTIC (2024T3 Aluminum Alloy) as given in the procedure that follows.
   (7) Attach the shim on the apron (4) and adjust it to the correct dimension.
   (8) Drill through the shim to copy the holes of the apron (4).
   (9) Remove the shim and clean it with Non Aqueous Cleaner-General - - (Material No.
08BAA9) .
   (10) Apply Release Agent-- Liquid Wax - (Material No.14DBB1) to the mating surface of the THS.
   (11) Apply a 2.0 mm (0.0787 in.) layer of Epoxy Adhesive-Metal to metal - Legacy (Material No.05EJL9) to the surface of the apron (4) and install the shim.
   (12) Apply a 2.0 mm (0.0787 in.) layer of Epoxy Adhesive-Metal to metal - Legacy (Material No.05EJL9) to the shim.
   (13) Put the apron (4) in position on the THS surface and install the screws (1), (2).
   (14) Tighten the screws (1), (2) until the distances between the apron (4) and the THS surface and the fuselage surface are correct.
NOTE: Tighten the screws (1), (2) by hand and in the correct sequence.
   (15) Remove the excess compound.
   (16) Let the Epoxy Adhesive-Metal to metal - Legacy (Material No.05EJL9) cure for 24 hours.
   (17) Remove the screws (1), (2) and the apron (4).
   (18) Remove the excess compound and remove the release agent from the mating surfaces.
   (19) Clean the mating surfaces with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (20) Install the seal (14) and the cover strip (12) with the screws (10).
Subtask 55-15-11-420-050-A
C. Installation of the Aprons
   (1) Apply the Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) to the mating surfaces of the aprons (4), (9).
   (2) Apply the Release Agent-- Liquid Wax - (Material No.14DBB1) to the mating surfaces of the aprons on the THS surface.
   (3) Install the upper apron (4).
CAUTION: DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF CARBONFIBER REINFORCED PLASTIC.
     (a) Put the apron (4) and the retainer (3) in position.
     (b) Make sure that the holes align with the holes in the THS surface.
     (c) Carefully install the screws (1) and (2) as identified during the removal procedure.
     (d) Make sure that there is sufficient clearance around each screw shaft.
NOTE: Do not use force to engage the screws (1), (2).
     (e) TORQUE the screws (1), (2) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in ) T in the correct sequence.
     (f) Make sure that there is a minimum clearance of 2.0 mm (0.0787 in.) between the apron (4) and the guide profile.
     (g) If the minimum clearance is less than 2.0 mm (0.0787 in.), do the subsequent steps:
       1 Loosen the screws (1) and (2).
       2 Adjust the apron (4) to get the correct clearance.
       3 Make sure that there is sufficient clearance around each screw shaft.
NOTE: Do not use force to engage the screws (1), (2).
       4 TORQUE the screws (1), (2) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in ) T in the correct sequence.
     (h) Clean the structure.
       1 Remove the unwanted sealant with the Non Aqueous Cleaner-General - - (Material No.
08BAA9) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) .
   (4) Install the lower apron.
     (a) Put the apron (9) and the retainer (8) in position.
     (b) Make sure that the holes align with the holes in the THS surface.
     (c) Carefully install the screws (5), (6) and (7) as identified during the removal procedure.
     (d) Make sure that there is sufficient clearance around each screw shaft.
NOTE: Do not use force to engage the screws (5), (6) and (7).
     (e) TORQUE the screws (5), (6) and (7) to between 0.9 and 0.8 m.daN (79.65 and 70.80 lbf.in ) T in the correct sequence
     (f) Make sure that there is a minimum clearance of 2.0 mm (0.0787 in.) between the apron (9) and the guide profile.
     (g) If the minimum clearance is less than 2.0 mm (0.0787 in.), do the subsequent steps:
       1 Loosen the screws (5), (6) and (7).
       2 Adjust the apron (9) to get the correct clearance.
       3 Make sure that there is sufficient clearance around each screw shaft.
NOTE: Do not use force to engage the screws (5), (6) and (7).
       4 TORQUE the screws (5), (6) and (7) to between 0.9 and 0.8 m.daN (79.65 and 70.80 lbf.in ) T in the correct sequence.
     (h) Clean the structure.
       1 Remove the unwanted sealant with the Non Aqueous Cleaner-General - - (Material No.
08BAA9) and a lint-free cotton cloth, Textile-Lint free Cotton - (Material No.14SBA1) .
       2 Make sure that the drain holes of the horizontal stabilizer spar-box in the related area are clear and not blocked.
Subtask 55-15-11-865-052-A
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
49VUFLIGHT CONTROLS/THS/ACTR/MOT219CE2B09
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
49VUAUTO FLT/FAC1/28VDC5CC1B04
49VUAUTO FLT/FAC1/26VAC14CC1B03
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
49VUFLIGHT CONTROLS/THS/ACTR/MOT219CE2B04
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
49VUAUTO FLT/FAC1/28VDC5CC1H10
49VUAUTO FLT/FAC1/26VAC14CC1H09
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
105VUFLT CTL/SEC1/STBY SPLY22CEB01
121VUAUTO FLT/RUDDER/TRIM/IND15CCM20
121VUAUTO FLT/FAC2/28VDC5CC2M19
121VUAUTO FLT/FAC2/26VAC14CC2M18
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
121VUFLIGHT CONTROLS/THS ACTR/MOT319CE3Q17
121VUFLIGHT CONTROLS/THS ACTR/MOT119CE1Q16
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
Subtask 55-15-11-720-050-A
E. Operational Test of the Trimmable Horizontal Stabilizer (THS)
WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
   (1) Operate the THS through the complete range (Ref. AMM TASK 27-44-00-710-002).
   (2) Make sure that there is a minimum clearance of 2.0 mm (0.0787 in.) between the aprons (4), (9) and the guide profiles at all THS positions during its movement.
   (3) Make sure that the aprons follow the contour of the fuselage smoothly.
5. Close-up
Subtask 55-15-11-410-050-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the access platform(s).
   (3) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 03:50:27 UTC