Detailed Inspection of Horizontal Stabilizer, Internal Structure of Torque Box, Inboard of Fuselage Fairings
TASK 55-10-00-210-001-A
Detailed Inspection of Horizontal Stabilizer, Internal Structure of Torque Box, Inboard of Fuselage Fairings
Refer to the MPD TASK: 551012-01
DETAILED INSPECTION OF HORIZONTAL STABILIZER, INTERNAL STRUCTURE OF TORQUE BOX, INBOARD OF FUSELAGE FAIRINGS
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 55-10-00-860-050-A
Subtask 55-10-00-210-050-A
Subtask 55-10-00-410-052-A
[Rev.10 from 2021]
2026.04.01 03:59:47 UTC
Detailed Inspection of Horizontal Stabilizer, Internal Structure of Torque Box, Inboard of Fuselage Fairings
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
YOU MUST PUT ON AND ATTACH A SAFETY HARNESS BEFORE YOU START WORK:
- ON THE THS OR IN THE REAR FUSELAGE
- ON TOP OF THE WINGS OR PYLONS.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobRefer to the MPD TASK: 551012-01
DETAILED INSPECTION OF HORIZONTAL STABILIZER, INTERNAL STRUCTURE OF TORQUE BOX, INBOARD OF FUSELAGE FAIRINGS
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| 98D27903500000 | 2 | PIN-SIDE STICK LOCKING |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05RAB9) | Adhesive Film Tape-- Aluminium Foil - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 333 | THS SPAR BOX |
| 343 | THS SPAR BOX |
| 312AR, 314AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-10-00-864-002-A | Depressurize the Yellow Hydraulic System |
| TASK 29-10-00-864-003-A | Depressurize the Blue Hydraulic System |
| TASK 52-41-23-010-801-A | Opening of Access Door 314AR |
| TASK 52-41-23-410-801-A | Closing of Access Door 314AR |
| SRM 551100 | |
Subtask 55-10-00-860-050-A
A. Depressurize Hydraulic Systems
(1) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. AMM TASK 29-10-00-864-001) (Ref. AMM TASK 29-10-00-864-002) (Ref. AMM TASK 29-10-00-864-003).
Subtask 55-10-00-865-050-A (1) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. AMM TASK 29-10-00-864-001) (Ref. AMM TASK 29-10-00-864-002) (Ref. AMM TASK 29-10-00-864-003).
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 55-10-00-481-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | FLIGHT CONTROLS/THS/ACTR/MOT2 | 19CE2 | B09 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | FLIGHT CONTROLS/THS/ACTR/MOT2 | 19CE2 | B04 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 121VU | FLIGHT CONTROLS/THS ACTR/MOT3 | 19CE3 | Q17 |
| 121VU | FLIGHT CONTROLS/THS ACTR/MOT1 | 19CE1 | Q16 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
C. Install Locking Devices
(1) Put the 98D27903500000 PIN-SIDE STICK LOCKING in the CAPT and F/O side stick controllers.
Subtask 55-10-00-941-050-A (1) Put the 98D27903500000 PIN-SIDE STICK LOCKING in the CAPT and F/O side stick controllers.
D. Safety Precautions
(1) Put the WARNING NOTICE(S) in the flight compartment to tell persons not to operate the flight controls.
(2) Put the WARNING NOTICE(S) in position to tell persons not to operate the hydraulic systems.
(3) Put the ACCESS PLATFORM 3M (10 FT) in position at zone 313 for the left hand sparbox and/or zone 314 for the right hand sparbox.
Subtask 55-10-00-010-050-A (1) Put the WARNING NOTICE(S) in the flight compartment to tell persons not to operate the flight controls.
(2) Put the WARNING NOTICE(S) in position to tell persons not to operate the hydraulic systems.
(3) Put the ACCESS PLATFORM 3M (10 FT) in position at zone 313 for the left hand sparbox and/or zone 314 for the right hand sparbox.
E. Access
(1) Open the access doors 312AR and 314AR (Ref. AMM TASK 52-41-23-010-801).
(2) Remove the peelable hole covers from the lightening holes.
4. Procedure(1) Open the access doors 312AR and 314AR (Ref. AMM TASK 52-41-23-010-801).
(2) Remove the peelable hole covers from the lightening holes.
Subtask 55-10-00-210-050-A
A. Detailed Inspection
(1) Make a detailed inspection of the horizontal stabilizer internal structure of the torque box inboard fuselage fairings, thru the lightening holes, for:
5. Close-up(1) Make a detailed inspection of the horizontal stabilizer internal structure of the torque box inboard fuselage fairings, thru the lightening holes, for:
- deterioration of the structure,
- stringer debonding and delamination,
- rib shear ties debonding,
- spar flanges debonding.
Subtask 55-10-00-410-052-A
A. Visual Inspection
(1) Make sure that the work area is clean and clear of tools and other items.
Subtask 55-10-00-410-050-A (1) Make sure that the work area is clean and clear of tools and other items.
B. Close Access
(1) Installation of the peelable hole covers.
(a) For each lightening hole, cut a piece of Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) with 20 mm (0.7874 in.) of excess of the hole dimension to make the peelable hole covers.
(b) Clean the adjacent area of the lightening holes with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) until contamination is removed. Do not let cleaning agent dry on the surfaces.
(c) Install the peelable hole covers on the lightening holes.
(2) Close the access doors 312AR and 314AR (Ref. AMM TASK 52-41-23-410-801).
Subtask 55-10-00-942-050-A (1) Installation of the peelable hole covers.
(a) For each lightening hole, cut a piece of Adhesive Film Tape-- Aluminium Foil - (Material No.05RAB9) with 20 mm (0.7874 in.) of excess of the hole dimension to make the peelable hole covers.
(b) Clean the adjacent area of the lightening holes with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) until contamination is removed. Do not let cleaning agent dry on the surfaces.
(c) Install the peelable hole covers on the lightening holes.
(2) Close the access doors 312AR and 314AR (Ref. AMM TASK 52-41-23-410-801).
C. Remove Ground Equipment
(1) Remove the WARNING NOTICE(S).
(2) Remove the access platform(s).
Subtask 55-10-00-081-050-A (1) Remove the WARNING NOTICE(S).
(2) Remove the access platform(s).
D. Remove Locking Pins
(1) Remove the 98D27903500000 PIN-SIDE STICK LOCKING from the CAPT and F/O side stick controllers.
Subtask 55-10-00-865-051-A (1) Remove the 98D27903500000 PIN-SIDE STICK LOCKING from the CAPT and F/O side stick controllers.
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | FLIGHT CONTROLS/THS/ACTR/MOT2 | 19CE2 | B09 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | FLIGHT CONTROLS/THS/ACTR/MOT2 | 19CE2 | B04 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 121VU | FLIGHT CONTROLS/THS ACTR/MOT3 | 19CE3 | Q17 |
| 121VU | FLIGHT CONTROLS/THS ACTR/MOT1 | 19CE1 | Q16 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
THS Sparbox Internal Structure Inboard Fuselage Fairings