W DOC AIRBUS | AMM A320F

Removal of the Maintenance Panels at Frame 35.5


TASK 53-22-14-000-002-A
Removal of the Maintenance Panels at Frame 35.5


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
131NW, 131UW, 132PW
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 25-54-12-000-001-A
Removal of the Forward Cargo-Compartment Partition
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 53-22-14-010-051-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) Open the fwd cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
   (2) Put an ACCESS PLATFORM 2M (6 FT) in position below the fwd cargo-compartment door.
   (3) Remove the fwd cargo-compartment partitions 131NW 131UW 132PW (Ref. AMM TASK 25-54-12-000-001).
4. Procedure
Subtask 53-22-14-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the Maintenance Panels (1):
   (1) Remove the screws (2) and the countersunk washers (3).
   (2) Remove the maintenance panels (1).
[Rev.10 from 2021] 2026.04.01 01:53:37 UTC