W DOC AIRBUS | AMM A320F

Installation of the External-Power Receptacle Door (121AL)


TASK 52-42-12-400-001-A
Installation of the External-Power Receptacle Door (121AL)


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Consumable Materials
REFERENCE
DESIGNATION
(Material No.06AEB2)
Polysulfide Sealant-Low Adhesion Fillet Structure
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
121AL
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
COTTER PIN
AIPC 52-42-12-01-100
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
3. Job Set-up
Subtask 52-42-12-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (2) Make sure that the access platform is in position.
Subtask 52-42-12-916-050-A
B. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Remove the sealant from the surface of the structure in contact with the hinge and clean the surface with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
   (3) Apply a bead of Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) on the structure in contact with the door hinge.
4. Procedure
Subtask 52-42-12-420-050-B
A. Installation of the External-Power Receptacle Door
   (1) Put the door (9) in position in its opening.
   (2) Hold the hinge (12) against the structure.
   (3) Install the three bolts (13) and tighten them.
   (4) Install the bonding lead (5), the washer (7) and the bolt (6) and tighten it.
NOTE: Do an electrical bonding when you install the bolt (6) and the washer (7) on the stucture (Ref. AMM TASK 20-28-00-912-802).
   (5) Put the spring (14) in position with the plate (8).
   (6) Install the screw (10), the washer (2) and the nut (4) and tighten it.
   (7) Safety the nut (4) with a new AIPC 52-42-12-01-100 COTTER PIN (3) (3).
   (8) Remove the unwanted sealant around the hinge and make sure that the bead of sealant around the hinge is continuous.
Subtask 52-42-12-210-051-A
B. Check of the External-Power Receptacle Door
   (1) Open and close the door.
   (2) Make sure that the door operates correctly.
5. Close-up
Subtask 52-42-12-410-050-A
A. Close Access
   (1) Close the access door
121AL.
   (2) Remove the access platform(s).
[Rev.10 from 2021] 2026.04.01 01:45:29 UTC