W DOC AIRBUS | AMM A320F

Visual Inspection of Cargo-Compartment Door Seals


TASK 52-30-00-200-002-A
Visual Inspection of Cargo-Compartment Door Seals


CAUTION: IMMEDIATELY AFTER YOU OPEN THE CARGO COMPARTMENT DOOR, RECORD ON THE WORK CARD ON THE DOOR, THE DATE AND TIME WHEN YOU OPENED IT. IF THE CARGO COMPARTMENT DOOR STAYS OPEN FOR 12 HOURS OR MORE, YOU MUST BLEED THE HYDRAULIC SYSTEM RELATED TO IT. IF YOU DO NOT OBEY THESE PRECAUTIONS, THE DOOR CAN CLOSE SUDDENLY WHEN YOU SET THE DOOR TO "CLOSE". THIS CAN CAUSE DAMAGE TO THE DOOR AND TO THE AIRCRAFT STRUCTURE.
1. Reason for the Job
Visual inspection of the cargo-compartment door seals after a leak check.
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-006-A
Open the Bulk Cargo-Compartment Door
TASK 52-30-00-860-008-A
Close the Bulk Cargo-Compartment Door
TASK 52-31-18-300-001-A
Repair of the Door Seal
TASK 52-32-18-300-001-A
Repair of the Door Seal
TASK 52-33-18-300-001-A
Repair of Bulk Door Seal
3. Job Set-up
Subtask 52-30-00-010-063-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) Open the FWD and/or AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) to get access to the door seal to be inspected.
Subtask 52-30-00-010-063-B ** ON A/C NOT FOR ALL
A. Get Access
   (1) Open the applicable cargo-compartment door to get access to the door seal to be inspected:
4. Procedure
Subtask 52-30-00-220-050-A ** ON A/C NOT FOR ALL
A. Inspection of the Door Seal
   (1) Do a visual inspection of the door seal for:
  • signs of chafe marks
  • minor cuts and small punctures
  • large areas of damage
  • the correct positions of the inflation holes.
NOTE: The inflation holes are in the correct positions if they are on the inner side of the cargo compartment door.
If the inflation holes are not in the correct location, it is not possible to inflate the door seal during the flight.
This causes the cabin pressure to decrease and can result in a disruption of the flight.
   (2) If necessary, repair the door seal:
Subtask 52-30-00-220-050-B ** ON A/C NOT FOR ALL
A. Inspection of the Door Seal
   (1) Do a visual inspection of the door seal for:
  • signs of chafe marks
  • minors cuts and small punctures
  • large areas of damage
  • the correct positions of the inflation holes.
NOTE: The inflation holes are in the correct positions if they are on the inner side of the cargo compartment door.
If the inflation holes are not in the correct location, it is not possible to inflate the door seal during the flight.
This causes the cabin pressure to decrease and can result in a disruption of the flight.
   (2) If necessary, repair the door seal:
5. Close-up
Subtask 52-30-00-410-058-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close applicable the FWD/AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
Subtask 52-30-00-410-058-B ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the applicable cargo-compartment door: