Installation of the Air Intake Nose (APS 3200)
TASK 49-16-44-400-002-A
Installation of the Air Intake Nose (APS 3200)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 49-16-44-860-050-A ** ON A/C NOT FOR ALL
Subtask 49-16-44-910-051-A ** ON A/C NOT FOR ALL
Subtask 49-16-44-910-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 12:42:32 UTC
Installation of the Air Intake Nose (APS 3200)
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | SCRAPER - NON METALLIC |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04TMB2) | Varnish-- Electrical Bonding Structure |
| (Material No.06AAB1) | Polysulfide Sealant-General Purpose Fillet - |
| (Material No.06AEA1) | Polysulfide Sealant-Low Adhesion Brushable - |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| (Material No.06LDG2) | Non Hardening Jointing Putty-High Temp. Area - Structure |
| (Material No.08ABC1) | Aqueous Cleaner-Aircraft Exterior Pressure Spraying - |
| (Material No.12AGC2) | Corrosion Preventive Compound-- Soft Film System |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 315AL, 316AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 52-41-00-010-001-A | Open the APU Doors for Access |
| TASK 52-41-00-410-001-A | Close the APU Doors after Access |
Subtask 49-16-44-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position below the access doors 315AL and 316AR.
(2) Make sure that the access doors 315AL and 316AR are open (Ref. AMM TASK 52-41-00-010-001).
(3) Make sure that the APU air intake flap is in open position.
Subtask 49-16-44-865-054-A ** ON A/C NOT FOR ALL (1) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position below the access doors 315AL and 316AR.
(2) Make sure that the access doors 315AL and 316AR are open (Ref. AMM TASK 52-41-00-010-001).
(3) Make sure that the APU air intake flap is in open position.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
Subtask 49-16-44-910-051-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Remove the old sealant. Use the solvent Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) and a SCRAPER - NON METALLIC.
(2) Clean the component interfaces and the adjacent area.
(3) Protective Treatment
(a) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) or Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to all screws and washers.
(4) Apply the Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) to the mating surfaces of the air intake nose (13), the bracket (4) and the end profile (5).
Subtask 49-16-44-420-051-A ** ON A/C NOT FOR ALL (1) Remove the old sealant. Use the solvent Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) and a SCRAPER - NON METALLIC.
(2) Clean the component interfaces and the adjacent area.
(3) Protective Treatment
(a) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) or Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to all screws and washers.
(4) Apply the Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) to the mating surfaces of the air intake nose (13), the bracket (4) and the end profile (5).
B. Installation of the Air Intake Nose
(1) Put the air intake nose (13) in position and hold it.
(2) Install the screws (1). Do not fully tighten the screws at this time.
(3) Install the screws (3) and the washers (2). Do not fully tighten the screws at this time.
(4) Install the bracket (4) and the end-profile (5) with the screws (7 and 8) and the washers (6 and 9).
(5) Install the bolts (10), the washers (11) and the nuts (12).
(6) Tighten all screws and bolts.
5. Close-up(1) Put the air intake nose (13) in position and hold it.
(2) Install the screws (1). Do not fully tighten the screws at this time.
(3) Install the screws (3) and the washers (2). Do not fully tighten the screws at this time.
(4) Install the bracket (4) and the end-profile (5) with the screws (7 and 8) and the washers (6 and 9).
(5) Install the bolts (10), the washers (11) and the nuts (12).
(6) Tighten all screws and bolts.
Subtask 49-16-44-910-052-A ** ON A/C NOT FOR ALL
A. Application of the Surface Treatments
(1) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) to all locations, where removed, when dry apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) .
(2) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) to all the nuts, washers and screwheads.
(3) Apply the Corrosion Preventive Compound-- Soft Film System (Material No.12AGC2) to all the screwheads.
Subtask 49-16-44-410-051-A ** ON A/C NOT FOR ALL (1) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) to all locations, where removed, when dry apply Varnish-- Electrical Bonding Structure (Material No.04TMB2) .
(2) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) to all the nuts, washers and screwheads.
(3) Apply the Corrosion Preventive Compound-- Soft Film System (Material No.12AGC2) to all the screwheads.
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the APU access doors 316AR 315AL (Ref. AMM TASK 52-41-00-410-001).
(3) Remove the access platform(s).
Subtask 49-16-44-865-055-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the APU access doors 316AR 315AL (Ref. AMM TASK 52-41-00-410-001).
(3) Remove the access platform(s).
Air Intake Nose