3. Job Set-up
Subtask 33-27-38-910-050-A ** ON A/C NOT FOR ALL
Subtask 33-27-38-420-050-A ** ON A/C NOT FOR ALL
Subtask 33-27-38-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:54:05 UTC
Installation of the Power Unit for the Cabin Attendant Work-Light
FIN: 12LZ ** ON A/C NOT FOR ALL
FIN: 13LZ ** ON A/C NOT FOR ALL
FIN: 3LZ ** ON A/C NOT FOR ALL
FIN: 512RHF ** ON A/C NOT FOR ALL
FIN: 512RHG ** ON A/C NOT FOR ALL
FIN: 512RHN ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 13LZ ** ON A/C NOT FOR ALL
FIN: 3LZ ** ON A/C NOT FOR ALL
FIN: 512RHF ** ON A/C NOT FOR ALL
FIN: 512RHG ** ON A/C NOT FOR ALL
FIN: 512RHN ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | STEPLADDER 1.0 M (3.3 FT) |
| AMP169994-1 | 1 | CRIMPING DEVICE |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 11 | CABLE TERMINALS | AIPC 33-27-04-10-020 |
| 12 | HOUSINGS | AIPC 33-27-04-10-030 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 33-27-00-710-001-A | Operational Test of the Cabin Attendant Work-Light |
Subtask 33-27-38-910-050-A ** ON A/C NOT FOR ALL
A. Preparation for Installation
(1) Make sure that the related panel is disengaged and lowered.
(2) Make sure that the STEPLADDER 1.0 M (3.3 FT) is in position below the related panel.
(3) Make the electrical cables (4) shorter if necessary and install the AIPC 33-27-04-10-020 CABLE TERMINALS (11) and the AIPC 33-27-04-10-030 HOUSINGS (12) with the AMP169994-1 CRIMPING DEVICE.
(4) Clean the component interfaces and the adjacent area.
(5) Do an inspection of the component interfaces and the adjacent area.
4. Procedure(1) Make sure that the related panel is disengaged and lowered.
(2) Make sure that the STEPLADDER 1.0 M (3.3 FT) is in position below the related panel.
(3) Make the electrical cables (4) shorter if necessary and install the AIPC 33-27-04-10-020 CABLE TERMINALS (11) and the AIPC 33-27-04-10-030 HOUSINGS (12) with the AMP169994-1 CRIMPING DEVICE.
(4) Clean the component interfaces and the adjacent area.
(5) Do an inspection of the component interfaces and the adjacent area.
Subtask 33-27-38-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Power Unit(s) for the Cabin Attendant Work-Light
(1) Installation of the Power Units 3LZ, 12LZ
(a) Put the power unit (1) in position and install with the washers (6), the screws (5) and the nuts (8).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Connect the electrical connectors (2) and (3).
(2) Installation of the Power Unit 13LZ
(a) Put the power unit (1) in position and install with the washers (6), the spacers (10) and the screws (5).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Connect the electrical connectors (2) and (3).
Subtask 33-27-38-410-050-A ** ON A/C NOT FOR ALL (1) Installation of the Power Units 3LZ, 12LZ
(a) Put the power unit (1) in position and install with the washers (6), the screws (5) and the nuts (8).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Connect the electrical connectors (2) and (3).
(2) Installation of the Power Unit 13LZ
(a) Put the power unit (1) in position and install with the washers (6), the spacers (10) and the screws (5).
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Connect the electrical connectors (2) and (3).
B. Close Access
(1) FOR [3LZ] (PCB ATTND WORK LT)
(a) Close the circuit breaker panel 2000VU.
(2) FOR [12LZ] (ATT WORK LIGHT)
(a) Close the circuit breaker panel 2001VU.
(3) FOR [13LZ] (POWER UNIT)
(a) Close and engage the combi panel 2042VU.
Subtask 33-27-38-710-050-A ** ON A/C NOT FOR ALL 5. Close-up(1) FOR [3LZ] (PCB ATTND WORK LT)
(a) Close the circuit breaker panel 2000VU.
(2) FOR [12LZ] (ATT WORK LIGHT)
(a) Close the circuit breaker panel 2001VU.
(3) FOR [13LZ] (POWER UNIT)
(a) Close and engage the combi panel 2042VU.
Subtask 33-27-38-410-051-A ** ON A/C NOT FOR ALL
A. Make sure that the work area is clean and clear of tools and other items.
Power Unit