Installation of the Lighting Controller
TASK 33-13-51-400-001-A
Installation of the Lighting Controller
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 33-13-51-865-051-A
Subtask 33-13-51-420-050-A
Subtask 33-13-51-410-050-A
[Rev.10 from 2021]
2026.04.01 00:52:59 UTC
Installation of the Lighting Controller
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| FOR [16LF] (CONTROLLER-LIGHTING) | ||
| FOR [30LF] (CONTROLLER-LIGHTING) | ||
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 211 | COCKPIT |
| 212 | COCKPIT |
| FOR [16LF] (CONTROLLER-LIGHTING) | |
| FOR [30LF] (CONTROLLER-LIGHTING) | |
| 811 | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 33-13-00-710-001-A | Operational Test of the Instrument and Panel Integral-Lighting |
Subtask 33-13-51-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 33-13-51-010-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 6LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/OVHD/PNL | 3LF | Y03 |
| FOR FIN: 16LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/MAIN INST/PNL AND/PED | 4LF | Y04 |
| FOR FIN: 30LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/GLARE/SHLD | 5LF | Y05 |
B. Get Access
(1) FOR [16LF] (CONTROLLER-LIGHTING), [30LF] (CONTROLLER-LIGHTING)
Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the zone 121.
(2) Make sure that the access door 811 is open.
(a) FOR [16LF] (CONTROLLER-LIGHTING), [30LF] (CONTROLLER-LIGHTING)
811
(3) FOR [6LF] (CONTROLLER-LIGHTING)
Make sure that the ceiling panel 211HC is removed.
4. Procedure(1) FOR [16LF] (CONTROLLER-LIGHTING), [30LF] (CONTROLLER-LIGHTING)
Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the zone 121.
(2) Make sure that the access door 811 is open.
(a) FOR [16LF] (CONTROLLER-LIGHTING), [30LF] (CONTROLLER-LIGHTING)
811
(3) FOR [6LF] (CONTROLLER-LIGHTING)
Make sure that the ceiling panel 211HC is removed.
Subtask 33-13-51-420-050-A
A. Installation of the Lighting Controller
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the electrical connectors (4) and (5).
(4) Put the lighting controller (1) in position opposite its housing (6). Hold it in this position.
(5) Install the lighting controller (1) with the lockwashers (2) and the four screws(3).
Subtask 33-13-51-865-052-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the electrical connectors (4) and (5).
(4) Put the lighting controller (1) in position opposite its housing (6). Hold it in this position.
(5) Install the lighting controller (1) with the lockwashers (2) and the four screws(3).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 33-13-51-710-050-A 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 6LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/OVHD/PNL | 3LF | Y03 |
| FOR FIN: 16LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/MAIN INST/PNL AND/PED | 4LF | Y04 |
| FOR FIN: 30LF (CONTROLLERLIGHTING) | |||
| 122VU | LIGHTING/INSTL LT/GLARE/SHLD | 5LF | Y05 |
Subtask 33-13-51-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) FOR [6LF] (CONTROLLER-LIGHTING)
Install the ceiling panel 211HC with an ALLEN wrench.
(3) Close the access door 811.
(a) FOR [16LF] (CONTROLLER-LIGHTING), [30LF] (CONTROLLER-LIGHTING)
811
(4) FOR [16LF] (CONTROLLER-LIGHTING), [30LF] (CONTROLLER-LIGHTING)
Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) FOR [6LF] (CONTROLLER-LIGHTING)
Install the ceiling panel 211HC with an ALLEN wrench.
(3) Close the access door 811.
(a) FOR [16LF] (CONTROLLER-LIGHTING), [30LF] (CONTROLLER-LIGHTING)
811
(4) FOR [16LF] (CONTROLLER-LIGHTING), [30LF] (CONTROLLER-LIGHTING)
Remove the access platform(s).