W DOC AIRBUS | AMM A320F

Installation of the Integrally-Lighted Identification Plate


TASK 33-13-42-400-001-A
Installation of the Integrally-Lighted Identification Plate


ZONE: 210
ZONE: 211
ZONE: 212
FIN: 10LF
FIN: 11LF
FIN: 12LF
FIN: 13LF
FIN: 14LF
FIN: 15LF
FIN: 34LF
FIN: 38LF
FIN: 40LF ** ON A/C NOT FOR ALL
FIN: 42LF ** ON A/C NOT FOR ALL
FIN: 43LF ** ON A/C NOT FOR ALL
FIN: 52LF ** ON A/C NOT FOR ALL
FIN: 8LF
FIN: 9LF
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
211
COCKPIT
212
COCKPIT
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 33-13-00-710-001-A
Operational Test of the Instrument and Panel Integral-Lighting
3. Job Set-up
Subtask 33-13-42-865-051-A
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VULIGHTING/INSTL LT/OVHD/PNL3LFY03
4. Procedure
Subtask 33-13-42-420-050-A
A. Installation of the Integrally-Lighted Identification Plate (8LF)
   (1) Put the integrally-lighted identification plate (39) in position on the overhead control and indicating panel 21VU (37).
   (2) Install and tighten the six screws (40).
   (3) Push the overhead control and indicating panel 21VU (37) and tighten the six quarter-turn fasteners (38).
Subtask 33-13-42-420-051-A ** ON A/C NOT FOR ALL
B. Installation of the Integrally-Lighted Identification Plate (9LF)
   (1) Put the integrally-lighted identification plate (23) in position on the overhead control and indicating panel 22VU (21).
   (2) Install and tighten the four screws (24).
   (3) Push the overhead control and indicating panel 22VU (21) and tighten the four quarter-turn fasteners (22).
Subtask 33-13-42-420-051-B ** ON A/C NOT FOR ALL
B. Installation of the Integrally-Lighted Identification Plate (9LF)
   (1) Put the integrally-lighted identification plate (23) in position on the overhead control and indicating panel 22VU (21).
   (2) Install and tighten the six screws (24).
   (3) Push the overhead control and indicating panel 22VU (21) and tighten the four quarter-turn fasteners (22).
Subtask 33-13-42-420-052-A
C. Installation of the Integrally-Lighted Identification Plates (10LF)
   (1) Put the integrally-lighted identification plate (20) in position on the flight control panel 24VU (17).
   (2) Install and tighten the two screws (19).
   (3) Push the flight control panel 24VU (17) and tighten the two quarter-turn fasteners (18).
Subtask 33-13-42-420-053-A
D. Installation of the Integrally-Lighted Identification Plate (11LF), if Installed
   (1) Put the integrally-lighted identification plate (27) in position on the overhead control and indicating panel 25VU (25).
   (2) Install and tighten the five screws (28).
   (3) Push the overhead control and indicating panel 25VU (25) and tighten the four quarter-turn fasteners (26).
Subtask 33-13-42-420-054-A
E. Installation of the Integrally-Lighted Identification Plates (34LF)
   (1) Put the integrally-lighted identification plate (43) in position on the flight control panel 23VU (41).
   (2) Install and tighten the two screws (42).
   (3) Push the flight control panel 23VU (41) and tighten the two quarter-turn fasteners (44).
Subtask 33-13-42-420-055-A
F. Installation of the Integrally-Lighted Identification Plate (12LF)
   (1) Put the integrally-lighted identification plate (31) in position on the air conditioned panel 30VU (29).
   (2) Install and tighten the five screws (32).
   (3) Push the air conditioned panel 30VU (29) and tighten the four quarter-turn fasteners (30).
Subtask 33-13-42-420-056-A
G. Installation of the Integrally-Lighted Identification Plate (13LF)
   (1) Put the integrally-lighted identification plate (35) in position on the electrical panel 35VU (33).
   (2) Install and tighten the five screws (36).
   (3) Push the electrical panel 35VU (33) and tighten the four quarter-turn fasteners (34).
Subtask 33-13-42-420-057-A
H. Installation of the Integrally-Lighted Identification Plate (14LF)
   (1) Put the integrally-lighted identification plate (16) in position on the hydraulic/fuel panel 40VU (13).
   (2) Install and tighten the five screws (15).
   (3) Push the hydraulic/fuel panel 40VU (13) and tighten the four quarter-turn fasteners (14).
Subtask 33-13-42-420-058-A
I. Installation of the Integrally-Lighted Identification Plate (15LF)
   (1) Put the integrally-lighted identification plate (60) in position on the overhead control and indicating panel 48VU (57).
   (2) Install and tighten the five screws (59).
   (3) Push the overhead control and indicating panel 48VU (57) and tighten the four quarter-turn fasteners (58).
Subtask 33-13-42-420-059-A
J. Installation of the Integrally-Lighted Identification Plate (38LF)
   (1) Put the integrally-lighted identification plate (63) in position on the reading light panel 54VU (61).
   (2) Install and tighten the four screws (62).
   (3) Push the reading light panel 54VU (61) and tighten the four quarter-turn fasteners (64).
Subtask 33-13-42-420-060-A
K. Installation of the Integrally-Lighted Identification Plate (43LF), if Installed
   (1) Put the integrally-lighted identification plate (7) in position on the HFDR control panel 56VU (5).
   (2) Install and tighten the two screws (6).
   (3) Push the HFDR control panel 56VU (5) and tighten the two quarter-turn fasteners (8).
Subtask 33-13-42-420-061-A
L. Installation of the Integrally-Lighted Identification Plate (52LF), if Installed
   (1) Put the integrally-lighted identification plate (12) in position on the cockpit door panel 45VU (9).
   (2) Install and tighten the six screws (11).
   (3) Push the cockpit door panel 45VU (9) and tighten the four quarter-turn fasteners (10).
Subtask 33-13-42-420-062-A
M. Installation of the Integrally-Lighted Identification Plate (42LF), if Installed
   (1) Put the integrally-lighted identification plate (48) in position on the ADIRS MSU panel 41VU (45).
   (2) Install and tighten the five screws (47).
   (3) Push the ADIRS MSU panel 41VU (45) and tighten the four quarter-turn fasteners (46).
Subtask 33-13-42-420-063-A
N. Installation of the Integrally-Lighted Identification Plate (40LF), if Installed
   (1) Put the integrally-lighted identification plate (50) in position on the overhead control and indicating panel 27VU (49).
   (2) Install and tighten the two screws (51).
   (3) Push the overhead control and indicating panel 27VU (49) and tighten the two quarter-turn fasteners (52).
Subtask 33-13-42-420-064-A
O. Installation of the Integrally-Lighted Identification Plate (39LF), if Installed
   (1) Put the integrally-lighted identification plate (56) in position on the fuel panel 51VU (53).
   (2) Install and tighten the two screws (55).
   (3) Push the fuel panel 51VU (53) and tighten the two quarter-turn fasteners (54).
Subtask 33-13-42-865-052-A
P. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VULIGHTING/INSTL LT/OVHD/PNL3LFY03
Subtask 33-13-42-710-050-A
Q. Do the operational test of the instrument and panel integral lighting (Ref. AMM TASK 33-13-00-710-001).
5. Close-up
Subtask 33-13-42-942-050-A
A. Make sure that the work area is clean and clear of tools and other items.
[Rev.10 from 2021] 2026.04.01 00:52:52 UTC