Restoration of the A/C after flight without NLG Leg Door Assy
TASK 32-22-00-440-003-A
Restoration of the A/C after flight without NLG Leg Door Assy
1. Reason for the Job
CDL 52-11
Nose Landing Gear Leg Door (712)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Referenced Information
3. Job Set-up
Subtask 32-22-00-860-058-A
Subtask 32-22-00-420-052-A
Subtask 32-22-00-860-059-A
[Rev.10 from 2021]
2026.04.01 00:43:02 UTC
Restoration of the A/C after flight without NLG Leg Door Assy
1. Reason for the Job
CDL 52-11
Nose Landing Gear Leg Door (712)
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY BARRIER(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-22-15-400-001-A | Installation of the NLG Leg Door-Assembly |
Subtask 32-22-00-860-058-A
A. Safety Precautions
(1) Put the SAFETY BARRIER(S) in position.
4. Procedure(1) Put the SAFETY BARRIER(S) in position.
Subtask 32-22-00-420-052-A
A. Installation of the NLG Leg Door
(1) Install the NLG leg door and all the attaching parts (Ref. AMM TASK 32-22-15-400-001).
Subtask 32-22-00-980-051-A (1) Install the NLG leg door and all the attaching parts (Ref. AMM TASK 32-22-15-400-001).
B. Manual Operation
(a) Set the L/G DOWN VMO/MMO SELECTION switch 22FP to NORM.
(b) Lock the safety cover and secure it with14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
5. Close-upWARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(1) In the avionics compartment on the panel 188VU: (a) Set the L/G DOWN VMO/MMO SELECTION switch 22FP to NORM.
(b) Lock the safety cover and secure it with
Subtask 32-22-00-860-059-A
A. Put the aircraft back to its initial configuration.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.