Installation of the Anti-Ice Interbulkhead System
TASK 30-21-49-400-015-A
Installation of the Anti-Ice Interbulkhead System
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 30-21-49-860-067-A ** ON A/C NOT FOR ALL
Subtask 30-21-49-420-073-A ** ON A/C NOT FOR ALL
Subtask 30-21-49-410-100-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:29:42 UTC
Installation of the Anti-Ice Interbulkhead System
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.V01-076) | Methyl Ethyl Ketone, Technical grade |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 30-21-49-400-014-B | Installation of the Anti-ice Duct No. 5 |
| TASK 70-23-11-911-013-A | General Torque Tightening Techniques |
| TASK 71-13-00-010-010-A | Opening of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 71-13-00-410-010-A | Closing of the Fan Cowls 437AL(447AL),438AR(448AR) |
Subtask 30-21-49-860-067-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(3) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(4) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
Subtask 30-21-49-010-114-A ** ON A/C NOT FOR ALL (1) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(3) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
(4) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
B. Make sure that the fan cowls are open (Ref. AMM TASK 71-13-00-010-010):
(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 30-21-49-110-068-A ** ON A/C NOT FOR ALL (1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
C. Clean the Ends of the Duct
(1) Remove the applicable COVER - BLANKING from the openings.
(2) Use a clean Textile-Lint free Cotton - (Material No.14SBA1) made moist withV01-076 Methyl Ethyl Ketone, Technical grade to clean the ends of the ducts and their mating surfaces.
4. Procedure(1) Remove the applicable COVER - BLANKING from the openings.
(2) Use a clean Textile-Lint free Cotton - (Material No.14SBA1) made moist with
Subtask 30-21-49-420-073-A ** ON A/C NOT FOR ALL
A. Assemble the Inner Duct (47) and the Outer Duct (42)
(1) If necessary, install the D-rings (48) and (50), and the 3-ring pack (43) on the outer duct (42).
(2) Put the inner duct (47) into the outer duct (42). Make sure that the inner duct (47) engages on the D-ring (50).
Subtask 30-21-49-420-074-A ** ON A/C NOT FOR ALL (1) If necessary, install the D-rings (48) and (50), and the 3-ring pack (43) on the outer duct (42).
(2) Put the inner duct (47) into the outer duct (42). Make sure that the inner duct (47) engages on the D-ring (50).
B. Installation of the Inner Duct (47) and the Outer Duct (42)
(1) If necessary, install the D-ring (46) on the spray ring (44).
(2) Put your hand into the air exhaust (49) and hold the inner duct (47).
(3) Hold the inner duct (47) and the outer duct (42) together and put them into the air intake cowl through the opening for the TAI access panel (37).
(4) Align the air exhaust (49) with the TAI access panel (37).
(5) Push the inner duct (47) and the outer duct (42) into the spray ring (44).
(6) Make sure that the inner duct is correctly engaged with the D-rings (46) and (50).
(7) Make sure that the outer duct (42) is correctly engaged with the D-ring (48) and the 3-ring pack (43).
Subtask 30-21-49-420-076-A ** ON A/C NOT FOR ALL (1) If necessary, install the D-ring (46) on the spray ring (44).
(2) Put your hand into the air exhaust (49) and hold the inner duct (47).
(3) Hold the inner duct (47) and the outer duct (42) together and put them into the air intake cowl through the opening for the TAI access panel (37).
(4) Align the air exhaust (49) with the TAI access panel (37).
(5) Push the inner duct (47) and the outer duct (42) into the spray ring (44).
(6) Make sure that the inner duct is correctly engaged with the D-rings (46) and (50).
(7) Make sure that the outer duct (42) is correctly engaged with the D-ring (48) and the 3-ring pack (43).
C. Installation of the Two Half Locating Plates (34) and (39)
(1) Put the half locating plate (39) in the correct position for installation on the rear bulkhead (35). Make sure that it is engaged in the outer duct (42).
(2) Loosely install the bolts (40).
(3) Put the half locating plate (34) in the correct position for installation on the rear bulkhead (35). Make sure that it is engaged in the outer duct (42).
(4) Loosely install the bolts (41).
(5) Hold the half locating plates (34) and (39) together.
(6) TORQUE the bolts (40) and (41) to between 44 and 36 lbf.in (0.50 and 0.41 m.daN )
(Ref. AMM TASK 70-23-11-911-013)
Subtask 30-21-49-220-061-A ** ON A/C NOT FOR ALL (1) Put the half locating plate (39) in the correct position for installation on the rear bulkhead (35). Make sure that it is engaged in the outer duct (42).
(2) Loosely install the bolts (40).
(3) Put the half locating plate (34) in the correct position for installation on the rear bulkhead (35). Make sure that it is engaged in the outer duct (42).
(4) Loosely install the bolts (41).
(5) Hold the half locating plates (34) and (39) together.
(6) TORQUE the bolts (40) and (41) to between 44 and 36 lbf.in (0.50 and 0.41 m.daN )
(Ref. AMM TASK 70-23-11-911-013)D. Measurement of the Inner Duct Movement
(1) Put your hand through the air exhaust (49) and move the inner duct (47). Move the inner duct (47) to the spray ring (44) and then to the half locating plates (34) and (39).
(2) Make sure that the total movement is a minimum of 0.250 in. (6.35 mm).
Subtask 30-21-49-420-087-A ** ON A/C NOT FOR ALL (1) Put your hand through the air exhaust (49) and move the inner duct (47). Move the inner duct (47) to the spray ring (44) and then to the half locating plates (34) and (39).
(2) Make sure that the total movement is a minimum of 0.250 in. (6.35 mm).
E. Install the coupling that attaches the Anti-ice Interbulkhead System to the Anti-ice Duct 5 (Ref. AMM TASK 30-21-49-400-014)
Subtask 30-21-49-420-075-A ** ON A/C NOT FOR ALL F. Installation of the Thermal Anti-Ice (TAI) access panel (37)
(2) Install the bolts (36).
(3) TORQUE the bolts (36) to between 28.6 and 23.4 lbf.in (0.32 and 0.26 m.daN )
(Ref. AMM TASK 70-23-11-911-013)
5. Close-upCAUTION:
MAKE SURE THAT THE OUTER DUCT SEAL (38) IS CORRECTLY ALIGNED WITH THE OUTER DUCT (42) AND TOUCHES IT ALL AROUND.
(1) Install the TAI access panel (37) to the outer duct (42). (2) Install the bolts (36).
(3) TORQUE the bolts (36) to between 28.6 and 23.4 lbf.in (0.32 and 0.26 m.daN )
(Ref. AMM TASK 70-23-11-911-013)Subtask 30-21-49-410-100-A ** ON A/C NOT FOR ALL
Anti-Ice Interbulkhead System