Reactivation of the Reservoir Air Pressure Switches of the Green and Yellow Hydraulic System
TASK 29-34-00-440-001-A
Reactivation of the Reservoir Air Pressure Switches of the Green and Yellow Hydraulic System
MMEL 29-09-04A
HYD G(B)(Y) RSVR LO AIR PR ALERT
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-34-00-865-052-A
Subtask 29-34-00-440-050-A
Subtask 29-34-00-410-051-A
[Rev.10 from 2021]
2026.04.01 00:28:00 UTC
Reactivation of the Reservoir Air Pressure Switches of the Green and Yellow Hydraulic System
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobMMEL 29-09-04A
HYD G(B)(Y) RSVR LO AIR PR ALERT
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 196BB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 29-34-00-865-052-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-34-00-010-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1384GH (AIR PRESSURE SWITCH) | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
| ** ON A/C ALL | |||
| FOR FIN: 3384GH (AIR PRESSURE SWITCH) | |||
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/MONG | 3700GD | Q37 |
B. Get Access
(1) Open the applicable access door for the pressure switch:
4. Procedure(1) Open the applicable access door for the pressure switch:
- one main gear door for 1384GH (Ref. AMM TASK 32-12-00-010-001).
NOTE: Access is better from the Right Hand (RH) side.
- 196BB and the RH main gear door for 3384GH (Ref. AMM TASK 32-12-00-010-001).
Subtask 29-34-00-440-050-A
A. Reactivation of the Reservoir Air Pressure-Switches
(1) Cut and discard the tie-wrap which attaches the cable of the pressure switch 1384GH or 3384GH to the structure.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Remove the protective caps from the connector (1) and the receptacle.
(5) Make sure that all the electrical connections are clean and in the correct condition.
(6) Connect the applicable electrical connector (1) 1384GH-A or 3384GH-A to the related pressure switch.
(7) Do the troubleshooting of the air pressure indication-system and do the applicable corrective procedure.
(8) Make sure that the reservoir is pressurized with air to the correct pressure (Ref. AMM TASK 29-14-00-614-002).
5. Close-up(1) Cut and discard the tie-wrap which attaches the cable of the pressure switch 1384GH or 3384GH to the structure.
(2) Clean the component interfaces and the adjacent area.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Remove the protective caps from the connector (1) and the receptacle.
(5) Make sure that all the electrical connections are clean and in the correct condition.
(6) Connect the applicable electrical connector (1) 1384GH-A or 3384GH-A to the related pressure switch.
(7) Do the troubleshooting of the air pressure indication-system and do the applicable corrective procedure.
(8) Make sure that the reservoir is pressurized with air to the correct pressure (Ref. AMM TASK 29-14-00-614-002).
Subtask 29-34-00-410-051-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Close the access door(s) as applicable:
Subtask 29-34-00-865-053-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Close the access door(s) as applicable:
- 196BB and/or
- the main gear door (Ref. AMM TASK 32-12-00-410-001).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 1384GH (AIR PRESSURE SWITCH) | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
| ** ON A/C ALL | |||
| FOR FIN: 3384GH (AIR PRESSURE SWITCH) | |||
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/MONG | 3700GD | Q37 |
Reservoir Air Pressure Switches of the Green and Yellow Hydraulic System