Deactivation of the Reservoir Air Pressure Switch and Check of the Reservoir Air Pressure of the Blue Hydraulic System
TASK 29-34-00-040-002-A
Deactivation of the Reservoir Air Pressure Switch and Check of the Reservoir Air Pressure of the Blue Hydraulic System
1. Reason for the Job
MMEL 29-09-04A
HYD G(B)(Y) RSVR LO AIR PR ALERT
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-34-00-865-064-A
Subtask 29-34-00-040-051-A
Subtask 29-34-00-410-053-A
[Rev.10 from 2021]
2026.04.01 00:28:01 UTC
Deactivation of the Reservoir Air Pressure Switch and Check of the Reservoir Air Pressure of the Blue Hydraulic System
1. Reason for the Job
MMEL 29-09-04A
HYD G(B)(Y) RSVR LO AIR PR ALERT
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | 2 | CAP - PROTECTION |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | TIE WRAP(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 197FB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
Subtask 29-34-00-865-064-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 29-34-00-010-053-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
B. Get Access
(1) Open the access door 197FB.
(2) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position to be satisfactory for the Blue reservoir.
4. Procedure(1) Open the access door 197FB.
(2) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position to be satisfactory for the Blue reservoir.
Subtask 29-34-00-040-051-A
A. Deactivation of the Reservoir Air Pressure Switch
(1) Disconnect the electrical connector (1) 2384GH-A from the pressure switch.
(2) Install a CAP - PROTECTION on the disconnected connector (1) and on the receptacle.
(3) Use a TIE WRAP(S) and attach the disconnected cable to a part of the structure.
(5) Look on the air pressure gages of the reservoir and make sure that the air pressure is not less than 37 psi.
(6) If necessary, pressurize the reservoir (Ref. AMM TASK 29-14-00-614-002).
5. Close-up(1) Disconnect the electrical connector (1) 2384GH-A from the pressure switch.
(2) Install a CAP - PROTECTION on the disconnected connector (1) and on the receptacle.
(3) Use a TIE WRAP(S) and attach the disconnected cable to a part of the structure.
NOTE: Attach the cable to the structure so that the disconnected end of the connector points down. This prevents the contamination of the connector with oil or other liquids.
(4) Make an entry in the logbook.(5) Look on the air pressure gages of the reservoir and make sure that the air pressure is not less than 37 psi.
(6) If necessary, pressurize the reservoir (Ref. AMM TASK 29-14-00-614-002).
Subtask 29-34-00-410-053-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform.
(3) Close the access door 197FB.
Subtask 29-34-00-865-068-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform.
(3) Close the access door 197FB.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
Reservoir Air Pressure Switch of the Blue Hydraulic System