W DOC AIRBUS | AMM A320F

Removal of the Torque Shaft


TASK 27-84-45-000-003-A
Removal of the Torque Shaft


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
FIN: 6008CM
FIN: 6058CM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
SAFETY BARRIER(S)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
98D27504030001
2
LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT
98D27803500001
1
LOCKING TOOL ZERO POS
98D27803500002
1
LOCKING TOOL ZERO POS
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
191BB, 192FB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 27-50-00-400-003-A
Installation of the Lock-Torque Shaft - Flaps and Slats (98D27504030001)
TASK 27-80-00-866-005-A
Retracting the Slats on the Ground
TASK 27-84-44-000-001-A
Removal of the Steady Bearing
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
3. Job Set-up
Subtask 27-84-45-941-073-A
A. Safety Precautions
   (1) Put the SAFETY BARRIER(S) in position.
   (2) Put a WARNING NOTICE(S) in position to tell persons not to operate the slat controls.
Subtask 27-84-45-860-066-A
B. Aircraft Maintenance Configuration
   (1) Retract the slats fully (Ref. AMM TASK 27-80-00-866-005).
   (2) Make sure that the 98D27803500001 LOCKING TOOL ZERO POS or 98D27803500002 LOCKING TOOL ZERO POS is on the flap/slat control lever on panel 114VU.
Subtask 27-84-45-865-097-A
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB06
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB01
** ON A/C ALL
121VUFLIGHT CONTROLS/SLT/CTL/SYS27CVR21
Subtask 27-84-45-010-060-A
D. Get Access
   (1) Remove the access panels 191BB 192FB (Ref. AMM TASK 53-35-13-000-002).
   (2) Install the 98D27504030001 LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT (Ref. AMM TASK 27-50-00-400-003):
  • on a torque shaft, indoard of the applicable component
  • on a torque shaft, outboard of the applicable component.
   (3) Remove the applicable steady bearing (15) (Ref. AMM TASK 27-84-44-000-001):
     (a) FOR [6008CM] (SLAT XMSN TORQUE SHAFT)
remove the steady bearing FIN 6007CM
     (b) FOR [6058CM] (SLAT XMSN TORQUE SHAFT)
remove the steady bearing FIN 6057CM.
4. Procedure
Subtask 27-84-45-020-052-A
A. Removal of the Torque Shafts FIN 6008CM(6058CM)
   (1) Remove the retaining ring (18), the pin (12) and then the universal joint (13).
[Rev.10 from 2021] 2026.04.01 07:07:44 UTC