Replacement of the Discharge Indicator Assembly
TASK 26-22-43-960-802-A
Replacement of the Discharge Indicator Assembly
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 26-22-43-010-051-A
Subtask 26-22-43-020-051-A
Subtask 26-22-43-410-051-A
[Rev.10 from 2021]
2026.03.31 23:45:45 UTC
Replacement of the Discharge Indicator Assembly
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 4035WM
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT) |
| No specific | AR | BRUSH - BRISTLED, FIBER, SOFT |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04QAB2) | Coating_- Flexible Structure |
| (Material No.06AAA1) | Polysulfide Sealant_General Purpose Brushable - |
| (Material No.06AAE1) | Polysulfide Sealant-General Purpose Smoother - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 314AR |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 3 | RIVETS | AIPC 26-22-04-03-080 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 52-41-23-010-801-A | Opening of Access Door 314AR |
| TASK 52-41-23-410-801-A | Closing of Access Door 314AR |
Subtask 26-22-43-010-051-A
A. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT) in position below the discharge indicator assembly (1).
(2) Open access door 314AR and safety it in the open position.
(Ref. AMM TASK 52-41-23-010-801).
4. Procedure(1) Put an ACCESS PLATFORM 4M (13 FT) in position below the discharge indicator assembly (1).
(2) Open access door 314AR and safety it in the open position.
(Ref. AMM TASK 52-41-23-010-801).
Subtask 26-22-43-020-051-A
A. Removal of the Discharge Indicator Assembly
(1) Disconnect the union (2) from the discharge indicator assembly (1).
(2) Remove the sealant.
(3) Remove the rivets (3) from the discharge indicator assembly (1).
(4) Remove and discard the discharge indicator assembly (1).
Subtask 26-22-43-210-052-A (1) Disconnect the union (2) from the discharge indicator assembly (1).
(2) Remove the sealant.
(3) Remove the rivets (3) from the discharge indicator assembly (1).
(4) Remove and discard the discharge indicator assembly (1).
B. Preparation for Installation
(1) Do an inspection of the discharge indicator components.
(2) Remove the unwanted material from the internal surfaces, shoulders and grooves of the housing with a BRUSH - BRISTLED, FIBER, SOFT.
(3) Use the BRUSH - BRISTLED, FIBER, SOFT with Non Aqueous Cleaner-General - - (Material No.08BAA9) and clean all metallic parts. Be careful when you work on the internal areas and grooves.
(4) Dry all parts fully with a Textile-Lint free Cotton - (Material No.14SBA1) .
Subtask 26-22-43-420-051-A (1) Do an inspection of the discharge indicator components.
(2) Remove the unwanted material from the internal surfaces, shoulders and grooves of the housing with a BRUSH - BRISTLED, FIBER, SOFT.
(3) Use the BRUSH - BRISTLED, FIBER, SOFT with Non Aqueous Cleaner-General - - (Material No.08BAA9) and clean all metallic parts. Be careful when you work on the internal areas and grooves.
(4) Dry all parts fully with a Textile-Lint free Cotton - (Material No.14SBA1) .
C. Installation of the Discharge Indicator Assembly
(1) Apply Polysulfide Sealant_General Purpose Brushable - (Material No.06AAA1) on the faying surface of the discharge indicator assembly (1).
(2) Put the discharge indicator assembly (1) in position.
(3) Seal the faying surface of the discharge indicator assembly (1) to the aircraft surface with Polysulfide Sealant-General Purpose Smoother - (Material No.06AAE1) .
(4) Install the AIPC 26-22-04-03-080 RIVETS (3).
(5) Apply sealant Coating_- Flexible Structure (Material No.04QAB2) two times on the bead of the discharge indicator assembly (1). Make sure that the thickness is 0.02 MM (0.0008 IN.).
(6) Install the union (2) on the discharge indicator assembly (1).
(7) Tighten the union (2).
5. Close-up(1) Apply Polysulfide Sealant_General Purpose Brushable - (Material No.06AAA1) on the faying surface of the discharge indicator assembly (1).
(2) Put the discharge indicator assembly (1) in position.
(3) Seal the faying surface of the discharge indicator assembly (1) to the aircraft surface with Polysulfide Sealant-General Purpose Smoother - (Material No.06AAE1) .
(4) Install the AIPC 26-22-04-03-080 RIVETS (3).
(5) Apply sealant Coating_- Flexible Structure (Material No.04QAB2) two times on the bead of the discharge indicator assembly (1). Make sure that the thickness is 0.02 MM (0.0008 IN.).
(6) Install the union (2) on the discharge indicator assembly (1).
(7) Tighten the union (2).
Subtask 26-22-43-410-051-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 314AR (Ref. AMM TASK 52-41-23-410-801).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 314AR (Ref. AMM TASK 52-41-23-410-801).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Discharge Indicator