W DOC AIRBUS | AMM A320F

Installation of the Fixed YZ-Latch of the ACT


TASK 25-52-44-400-003-A
Installation of the Fixed YZ-Latch of the ACT


WARNING: DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
  • FLUSH IT AWAY WITH CLEAN WATER
  • GET MEDICAL AID.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM THE MATERIAL MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
ZONE: 150
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
1
SCRAPER - PLASTIC
No specific
1
SCRAPER - WOODEN
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.06AAC1)
Polysulfide Sealant-General Purpose Interfay -
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.12ABB1)
Corrosion Preventive Compound-Water Displacing Hard Film -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
150
AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 25-55-11-000-003-A
Removal of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59
TASK 25-55-11-400-003-A
Installation of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59
TASK 28-11-27-000-001-A
Removal of the Additional Center Tank (ACT)
TASK 28-11-27-400-001-A
Installation of the Additional Center Tank (ACT)
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 53-42-14-000-001-A
Removal of the Aft Cargo-Compartment Floor-Panels Zone 150
TASK 53-42-14-400-001-A
Installation of the Aft Cargo-Compartment Floor-Panels Zone 150
TASK 53-42-14-400-001-A-01
Installation of the Aft Cargo-Compartment Floor-Panels (Alternative Installation Procedure with the Skyflex Option)
3. Job Set-up
Subtask 25-52-44-860-052-B ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the forward or aft cargo compartment door is opened (Ref. AMM TASK 52-30-00-860-001).
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) is in position at the opening of the forward or aft cargo compartment door.
   (3) Make sure that the applicable ACT(s) is(are) removed (Ref. AMM TASK 28-11-27-000-001).
   (4) Make sure that the sidewall panels are removed (Ref. AMM TASK 25-55-11-000-003).
   (5) Make sure that the floor panels are removed (Ref. AMM TASK 53-42-14-000-001).
4. Procedure
Subtask 25-52-44-910-058-A ** ON A/C NOT FOR ALL
A.
F Fixed YZ-Latches for 2 ACT ** ON A/C NOT FOR ALL
   (1) Remove the unwanted sealant from the YZ-latch (2), the shim plate (3) and the structure (6) with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a SCRAPER - WOODEN or SCRAPER - PLASTIC.
   (2) Clean the component interfaces and the adjacent area.
   (3) Do an inspection of the component interfaces and the adjacent area.
   (4) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the thread of all the bolts (1) and the screws (5).
Subtask 25-52-44-420-063-A ** ON A/C NOT FOR ALL
B.
F Fixed YZ-Latches for 2 ACT ** ON A/C NOT FOR ALL
   (1) When you connect/install the components, refer to the match marks made during the removal procedure.
   (2) Apply a layer of Polysulfide Sealant-General Purpose Interfay - (Material No.06AAC1) on the mating surface of the YZ-latches (2) and shim plates (3).
   (3) Put the YZ-latch (2) together with the shim plate (3) in position on the structure (6).
   (4) Install the bolts (1) and the nuts (4) in the YZ-latch (2).
   (5) Tighten the nuts (4).
   (6) Install the screws (5) through the shim plate (3) and the YZ-latch (2).
   (7) Tighten the screws (5).
   (8) Apply the Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) on to the nuts (4), the bolts (1) and the screws (5).
Subtask 25-52-44-710-050-A ** ON A/C NOT FOR ALL
C.
F Fixed YZ-Latches for 2 ACT ** ON A/C NOT FOR ALL
   (1) Measure the distance between the fixed YZ-latches (2).
NOTE: The distance must be 1568.4 +0.2 mm or -0.2 mm (61.75 +0.01 in. or -0.01 in.).
   (2) If necessary adjust the fixed YZ-latches (2) with the adjustment screw (7).
   (3) Turn the adjustment screw (7) to change the measurement as necessary.
   (4) Apply Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) to the adjustment screw (7).
5. Close-up
Subtask 25-52-44-410-057-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the sidewall panels (Ref. AMM TASK 25-55-11-400-003).
   (2) Install the floor panels (Ref. AMM TASK 53-42-14-400-001).
   (3) Install the applicable ACT (Ref. AMM TASK 28-11-27-400-001).
   (4) Remove the WARNING NOTICE(S).
   (5) Make sure that the work area is clean and clear of tools and other items.
   (6) Close the aft cargo compartment door (Ref. AMM TASK 52-30-00-860-002).
   (7) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 23:38:20 UTC