Removal of the Hand Grip
TASK 25-45-23-000-001-A
Removal of the Hand Grip
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 25-45-23-861-050-A
Subtask 25-45-23-020-050-A
[Rev.10 from 2021]
2026.03.31 23:36:27 UTC
Removal of the Hand Grip
ZONE: 200
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
Subtask 25-45-23-861-050-A
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-45-23-020-050-A
A. Removal of the Hand Grip
(1) Support the hand grip (1) and remove the pins (2).
(2) Remove the hand grip (1).
(1) Support the hand grip (1) and remove the pins (2).
(2) Remove the hand grip (1).
Hand Grip