W DOC AIRBUS | AMM A320F

Removal of the Hand Grip


TASK 25-45-23-000-001-A
Removal of the Hand Grip


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
3. Job Set-up
Subtask 25-45-23-861-050-A
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-45-23-020-050-A
A. Removal of the Hand Grip
   (1) Support the hand grip (1) and remove the pins (2).
   (2) Remove the hand grip (1).