W DOC AIRBUS | AMM A320F

Removal of the Waste Chute Flap


TASK 25-45-15-000-001-A
Removal of the Waste Chute Flap


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
3. Job Set-up
Subtask 25-45-15-861-050-A
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-45-15-020-050-B
A. Removal of the Waste Chute Flap (Plastic)
   (1) Open the access door (2) and remove the waste container (3).
   (2) Remove the screws (6) and the washers (5).
   (3) Remove the waste chute flap (1) from the hinge (4).
NOTE: The waste chute flap must be removed from under the wash basin.
[Rev.10 from 2021] 2026.03.31 23:35:51 UTC