Removal of the Waste Chute Flap
TASK 25-45-15-000-001-A
Removal of the Waste Chute Flap
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 25-45-15-861-050-A
Subtask 25-45-15-020-050-B
[Rev.10 from 2021]
2026.03.31 23:35:51 UTC
Removal of the Waste Chute Flap
ZONE: 200
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
Subtask 25-45-15-861-050-A
A. Aircraft Maintenance Configuration
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-45-15-020-050-B
A. Removal of the Waste Chute Flap (Plastic)
(1) Open the access door (2) and remove the waste container (3).
(2) Remove the screws (6) and the washers (5).
(3) Remove the waste chute flap (1) from the hinge (4).
(1) Open the access door (2) and remove the waste container (3).
(2) Remove the screws (6) and the washers (5).
(3) Remove the waste chute flap (1) from the hinge (4).
NOTE: The waste chute flap must be removed from under the wash basin.
Waste Chute Flap (Plastic)