Removal of the Oven Control Module
TASK 25-35-19-000-004-A
Removal of the Oven Control Module
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-35-19-861-059-A ** ON A/C NOT FOR ALL Subtask 25-35-19-860-070-A ** ON A/C NOT FOR ALL
Subtask 25-35-19-020-053-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 06:15:35 UTC
Removal of the Oven Control Module
ZONE: 200
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | CAP - BLANKING |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
Subtask 25-35-19-861-059-A ** ON A/C NOT FOR ALL Subtask 25-35-19-860-070-A ** ON A/C NOT FOR ALL
B. At the related galley on the galley control panel:
(1) Open, safety and tag the related circuit breaker(s) of the oven.
4. Procedure(1) Open, safety and tag the related circuit breaker(s) of the oven.
Subtask 25-35-19-020-053-B ** ON A/C NOT FOR ALL
A. Removal of the Oven Control Module (OCM)
(1) Carefully pull the OCM (1) out of the mounting rails (2).
(2) Disconnect the electrical connectors and remove the OCM (1) from the galley.
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(1) Carefully pull the OCM (1) out of the mounting rails (2).
(2) Disconnect the electrical connectors and remove the OCM (1) from the galley.
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
Oven Control Module