Removal of the MCD Rail System
TASK 25-26-43-000-012-A
Removal of the MCD Rail System
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Consumable Materials
B. Referenced Information
3. Job Set-up
Subtask 25-26-43-861-058-A ** ON A/C NOT FOR ALL Subtask 25-26-43-010-068-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 25-26-43-020-061-F ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 06:09:47 UTC
Removal of the MCD Rail System
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05RDA1) | Adhesive Film Tape-Masking - - |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 25-26-43-000-004-A | Removal of the Center Class Divider |
Subtask 25-26-43-861-058-A ** ON A/C NOT FOR ALL Subtask 25-26-43-010-068-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 25-26-43-020-061-F ** ON A/C NOT FOR ALL
A. Removal of the Rail System
(1) Open the door (3) of the overhead stowage compartment.
(2) Hold the rail (1) in position and remove the screws (5) and the washers (4).
(3) Carefully remove the rail (1) and the shim plates (2).
Subtask 25-26-43-020-065-A ** ON A/C NOT FOR ALL (1) Open the door (3) of the overhead stowage compartment.
(2) Hold the rail (1) in position and remove the screws (5) and the washers (4).
(3) Carefully remove the rail (1) and the shim plates (2).
B. Remove the Single Beam Movable Class Divider Rail System.
(1) Open the cover(s) (1).
(2) Remove the screws (2).
(3) Remove the bracket(s) (3) with the electrical connector(s) (4) and the wires (5) out of the rail(s) (6) and attach them with masking tape Adhesive Film Tape-Masking - - (Material No.05RDA1) to the structure.
(4) Open the overhead stowage compartment door(s) (7).
(5) Record the position of the rail(s) (6) for the installation procedure.
(6) Remove the screws (8), the washers (9) and the rail(s) (6).
(1) Open the cover(s) (1).
(2) Remove the screws (2).
(3) Remove the bracket(s) (3) with the electrical connector(s) (4) and the wires (5) out of the rail(s) (6) and attach them with masking tape Adhesive Film Tape-Masking - - (Material No.05RDA1) to the structure.
(4) Open the overhead stowage compartment door(s) (7).
(5) Record the position of the rail(s) (6) for the installation procedure.
(6) Remove the screws (8), the washers (9) and the rail(s) (6).
MCD-Center Rail