W DOC AIRBUS | AMM A320F

Removal of the Mirror


TASK 25-24-41-000-803-A
Removal of the Mirror


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
STEPLADDER 0.5 M (1.6 FT)
No specific
AR
WIRE - SOFT, FLEXIBLE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
3. Job Set-up
Subtask 25-24-41-860-059-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
   (2) Put a STEPLADDER 0.5 M (1.6 FT) near the related Overhead Stowage Compartment (OHSC).
   (3) Remove and identify the equipment which is kept in the OHSC.
4. Procedure
Subtask 25-24-41-020-070-A ** ON A/C NOT FOR ALL
A. Removal of the Mirror
   (1) This procedure is applicable for KomyMirrors.
   (2) Make match marks on the components that you disconnect/remove to record their connections/positions. This is important for the subsequent installation procedure.
   (3) Open the door of the OHSC.
   (4) With your two hands, pull a thin WIRE - SOFT, FLEXIBLE with tension.
   (5) Put the WIRE - SOFT, FLEXIBLE in position on the top of the mirror.
   (6) Pull the WIRE - SOFT, FLEXIBLE between the adhesive tape and the wall of the OHSC.
   (7) Remove the mirror gradually and carefully to prevent damage to the wall.
[Rev.10 from 2021] 2026.03.31 23:32:12 UTC