W DOC AIRBUS | AMM A320F

Removal of the Power Outlet Unit(s)


TASK 25-21-37-000-001-A
Removal of the Power Outlet Unit(s)


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
F Power Outlet Unit ** ON A/C NOT FOR ALL
F Power Outlet Unit ** ON A/C NOT FOR ALL
F Power Outlet Unit ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 25-21-37-861-050-A ** ON A/C NOT FOR ALL
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-21-37-865-055-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUINSEAT POWER-MCU 259HPB08
2000VUINSEAT POWER-MCU 158HPB05
** ON A/C NOT FOR ALL
2000VUSEAT POWER-MCU 259HPB08
2000VUSEAT POWER-MCU 158HPB05
4. Procedure
Subtask 25-21-37-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Power Outlet Unit
F Power Outlet Unit ** ON A/C NOT FOR ALL
F Power Outlet Unit ** ON A/C NOT FOR ALL
   (1) Loosen the screws (2) to release the latches (3).
   (2) Pull out the outlet units (1) to get access to the electrical connectors (4).
   (3) Disconnect the electrical connectors (4).
   (4) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (5) Remove the outlet units (1).
Subtask 25-21-37-020-050-B ** ON A/C NOT FOR ALL
A. Removal of the Power Outlet Units
F Power Outlet Unit ** ON A/C NOT FOR ALL
   (1) Remove the front plates:
     (a) Remove the screws (1).
     (b) Carefully lift the front plates (2) at the screw-side to disengage the hooks (7).
     (c) Remove the front plates (2).
   (2) Loosen the screws (4) to fully release the latches (5).
   (3) Pull out the outlet units (3) to get access to the electrical connectors (6).
   (4) Disconnect the electrical connectors (6).
   (5) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (6) Remove the outlet units (3).
[Rev.10 from 2021] 2026.03.31 23:30:23 UTC