W DOC AIRBUS | AMM A320F

Removal of the Power Outlet Unit


TASK 25-18-11-000-801-A
Removal of the Power Outlet Unit


FIN: 4NA ** ON A/C NOT FOR ALL
FIN: 5NA ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
3. Job Set-up
Subtask 25-18-11-861-050-A ** ON A/C NOT FOR ALL
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-18-11-865-050-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUPILOTS OUTLETS/STAT INV1NAK25
121VUPILOTS OUTLETS/115V 60HZ2NAK23
4. Procedure
Subtask 25-18-11-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Power Outlet Unit
F Power Outlet Unit ** ON A/C NOT FOR ALL
CAUTION: WHEN YOU REMOVE THE SCREWS AND WASHERS OF THE POWER OUTLET UNIT, BE CAREFUL NOT TO CAUSE DAMAGE TO THE ELECTRICAL CONNECTORS.
   (1) Remove the screws (4) and the washers (5).
   (2) Disconnect the electrical connectors from the power outlet unit (2).
   (3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (4) Remove the screws (3).
   (5) Remove the power outlet unit (2) from the VU panel (1).
[Rev.10 from 2021] 2026.03.31 23:29:34 UTC