W DOC AIRBUS | AMM A320F

Removal of Outlet Assembly Panels 211LC and 212LC


TASK 25-13-41-000-806-A
Removal of Outlet Assembly Panels 211LC and 212LC


ZONE: 211
ZONE: 212
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
211
COCKPIT
212
COCKPIT
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 25-13-41-000-001-A
Removal of the Ceiling Panels
3. Job Set-up
Subtask 25-13-41-860-052-A
A. Aircraft Maintenance Configuration
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-13-41-010-050-A
B. Get Access
   (1) Remove the adjacent ceiling panels (Ref. AMM TASK 25-13-41-000-001).
4. Procedure
Subtask 25-13-41-020-061-A
A. Removal of Outlet Assembly Panels 211LC and 212LC
   (1) Remove the screws (3) and (11) and the washers (2) and (10).
   (2) Unlock the fasteners (6).
   (3) Remove the screws (8) and the washers (7) from the brackets (9).
   (4) Remove the screw (4) and the washer (5).
   (5) Remove the clamps (12) and disengage the duct (13) from the panel (1).
   (6) Remove the panel (1).
[Rev.10 from 2021] 2026.03.31 23:28:58 UTC