1. Reason for the Job
Refer to the MPD TASK: 200151-03
GENERAL VISUAL INSPECTION OF EWIS INSTALLED AT THE ACT(S) (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-92-00-010-132-A ** ON A/C NOT FOR ALL
Subtask 24-92-00-210-096-A ** ON A/C NOT FOR ALL
Subtask 24-92-00-410-130-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:26:34 UTC
General Visual Inspection of EWIS Installed at the ACT(s)(EWIS)
1. Reason for the Job
Refer to the MPD TASK: 200151-03
GENERAL VISUAL INSPECTION OF EWIS INSTALLED AT THE ACT(S) (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | FLASHLIGHT |
| No specific | AR | MIRROR - INSPECTION, FLEXIBLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 151 | AFT CARGO COMPARTMENT |
| 152 | AFT CARGO COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 28-11-27-000-001-A | Removal of the Additional Center Tank (ACT) |
| TASK 28-11-27-000-002-A | Removal of Additional Center Tank No.1 (ACT AFT1) |
| TASK 28-11-27-000-003-A | Removal of the Additional Center Tank No.2 (ACT AFT2) |
| TASK 28-11-27-400-001-A | Installation of the Additional Center Tank (ACT) |
| TASK 28-11-27-400-002-A | Installation of Additional Center Tank No.1 (ACT AFT1) |
| TASK 28-11-27-400-003-A | Installation of the Additional Center Tank No.2 (ACT AFT2) |
| ESPM 2052110 | |
Subtask 24-92-00-010-132-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Remove the ACT (if installed in the after cargo compartment) (Ref. AMM TASK 28-11-27-000-001) in zones 151 and 152.
Subtask 24-92-00-010-132-B ** ON A/C NOT FOR ALL (1) Remove the ACT (if installed in the after cargo compartment) (Ref. AMM TASK 28-11-27-000-001) in zones 151 and 152.
A. Get Access
(1) Remove the ACT No. 1 (Ref. AMM TASK 28-11-27-000-002), No. 2 (Ref. AMM TASK 28-11-27-000-003) and/or No. 3 (Ref. AMM D/O 28-11-27-00), in zones 151 and 152.
4. Procedure(1) Remove the ACT No. 1 (Ref. AMM TASK 28-11-27-000-002), No. 2 (Ref. AMM TASK 28-11-27-000-003) and/or No. 3 (Ref. AMM D/O 28-11-27-00), in zones 151 and 152.
Subtask 24-92-00-210-096-A ** ON A/C NOT FOR ALL
A. General Visual Inspection of All Wiring Installed at the ACT(s)
(1) Do a visual inspection of the wiring to make sure that there are no signs of ageing, alteration, overheating, scaling and deformation ESPM 2052110.
5. Close-up(1) Do a visual inspection of the wiring to make sure that there are no signs of ageing, alteration, overheating, scaling and deformation ESPM 2052110.
NOTE: Use a FLASHLIGHT or a MIRROR - INSPECTION, FLEXIBLE if necessary.
(2) Make sure that there is no dust, lint or hydraulic contamination. Subtask 24-92-00-410-130-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ACT (if removed) (Ref. AMM TASK 28-11-27-400-001) in zones 151 and 152.
Subtask 24-92-00-410-130-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ACT (if removed) (Ref. AMM TASK 28-11-27-400-001) in zones 151 and 152.
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ACT No. 1 (Ref. AMM TASK 28-11-27-400-002), No. 2 (Ref. AMM TASK 28-11-27-400-003) and/or No. 3 (Ref. AMM D/O 28-11-27-40), in zones 151 and 152.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ACT No. 1 (Ref. AMM TASK 28-11-27-400-002), No. 2 (Ref. AMM TASK 28-11-27-400-003) and/or No. 3 (Ref. AMM D/O 28-11-27-40), in zones 151 and 152.