W DOC AIRBUS | AMM A320F

Inspection after Engine Windmilling (After Engine In-Flight Shut Down)


TASK 05-51-34-200-001-A
Inspection after Engine Windmilling (After Engine In-Flight Shut Down)


1. Reason for the Job
Do this procedure if an engine In-Flight Shut Down (IFSD) occurred (the engine is balanced).
If the engine is not balanced (part liberation), you must do procedure 05-51-26 Inspection after an Engine Failure.
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 72-00-00-100-001-A
Engine Dry-out and Re lubrication
TASK 72-00-00-100-007-A
Engine Dry-out and Re lubrication
TASK 72-00-00-200-021-A
Inspection after Engine Windmilling
TASK 72-00-00-210-814-A
Inspection of the Engine after Engine Windmilling
3. Job Set-up
Subtask 05-51-34-860-050-A
A. Not Applicable
4. Procedure
Subtask 05-51-34-210-050-A ** ON A/C NOT FOR ALL
A. Do the engine dry-out and relubrication procedure after each IFSD (Ref. AMM TASK 72-00-00-100-001).
Subtask 05-51-34-210-050-B ** ON A/C NOT FOR ALL
A. Do the inspection after engine windmilling (Ref. AMM TASK 72-00-00-200-021)
Subtask 05-51-34-210-050-C ** ON A/C NOT FOR ALL
A. Do the engine dry-out and relubrication procedure after each IFSD (Ref. AMM TASK 72-00-00-100-007).
Subtask 05-51-34-210-050-E ** ON A/C NOT FOR ALL
A. Do the inspection after engine windmilling (Ref. AMM TASK 72-00-00-210-814).
[Rev.10 from 2021] 2026.03.31 22:51:54 UTC