W DOC AIRBUS | AMM A320F

GENERAL VISUAL INSPECTION OF PYLON TO WING LEADING EDGE (EWIS)


TASK 05-24-70-210-801-A
GENERAL VISUAL INSPECTION OF PYLON TO WING LEADING EDGE (EWIS)


ZONE: 471
ZONE: 472
ZONE: 481
ZONE: 482
1. Reason for the Job
Refer to the MPD TASK: ZL-471-02
GENERAL VISUAL INSPECTION OF PYLON TO WING LEADING EDGE (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
471
PYLON LEADING EDGE
472
PYLON LEADING EDGE
481
PYLON LEADING EDGE
482
PYLON LEADING EDGE
471AL, 471BL, 471CL, 472AR, 472BR, 481AL, 481BL, 482AR, 482BR, 482CR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 54-53-11-000-804-A
Removal of the Pylon-to-Wing Access Panels and Doors
TASK 54-53-11-400-804-A
Installation of the Pylon-to-Wing Access Panels and Doors
3. Job Set-up
Subtask 05-24-70-010-051-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at zone 470 (480).
   (2) Remove the access panels (Ref. AMM TASK 54-53-11-000-804):
4. Procedure
Subtask 05-24-70-210-051-A ** ON A/C NOT FOR ALL
A. Do a general visual inspection of the pylon to wing leading edge.
Make sure that:
  • There is no damage (corrosion, leaks or cracks) on all the parts of the components and the structure that you can see
  • All the installations (wiring, piping, ducting) are correctly attached.
5. Close-up
Subtask 05-24-70-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panels (Ref. AMM TASK 54-53-11-400-804):
   (3) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 22:50:02 UTC