GENERAL VISUAL INSPECTION OF FAN COMPARTMENT (EWIS)
TASK 05-24-30-210-802-A
GENERAL VISUAL INSPECTION OF FAN COMPARTMENT (EWIS)
Refer to the MPD TASK: ZL-435-02
GENERAL VISUAL INSPECTION OF FAN COMPARTMENT (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-24-30-010-054-A ** ON A/C NOT FOR ALL
Subtask 05-24-30-210-054-A ** ON A/C NOT FOR ALL
Subtask 05-24-30-410-054-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 22:49:56 UTC
GENERAL VISUAL INSPECTION OF FAN COMPARTMENT (EWIS)
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
1. Reason for the JobRefer to the MPD TASK: ZL-435-02
GENERAL VISUAL INSPECTION OF FAN COMPARTMENT (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 435 | FAN AND ACCESSORY GEARBOX |
| 436 | FAN AND ACCESSORY GEARBOX |
| 445 | FAN AND ACCESSORY GEARBOX |
| 446 | FAN AND ACCESSORY GEARBOX |
| 437AL, 438AR, 447AL, 448AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-802-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-802-A | Closing of the Fan Cowl Doors |
Subtask 05-24-30-010-054-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) in position at zone 435 (445).
(2) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-802):
437AL 438AR 447AL and 448AR.
4. Procedure(1) Put an ACCESS PLATFORM 2M (6 FT) in position at zone 435 (445).
(2) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-802):
437AL 438AR 447AL and 448AR.
Subtask 05-24-30-210-054-A ** ON A/C NOT FOR ALL
A. Do a general visual inspection of the fan compartment.
Make sure that:
5. Close-upMake sure that:
- There is no damage (corrosion, leaks or cracks) on all the parts of the components and the structure that you can see
- All the installations (wiring, piping, ducting) are correctly attached.
Subtask 05-24-30-410-054-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
437AL 438AR 447AL and 448AR.
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
437AL 438AR 447AL and 448AR.
(3) Remove the access platform(s).
Access Door of the Left Nacelle (Left Side)