W DOC AIRBUS | AMM A320F

GENERAL VISUAL INSPECTION OF AIR INTAKE LIP (EWIS)


TASK 05-24-30-200-001-A
GENERAL VISUAL INSPECTION OF AIR INTAKE LIP (EWIS)


ZONE: 433
ZONE: 434
ZONE: 443
ZONE: 444
1. Reason for the Job
Refer to the MPD TASK: ZL-433-01
GENERAL VISUAL INSPECTION OF AIR INTAKE LIP (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
433
AIR INTAKE LIP
434
AIR INTAKE LIP
443
AIR INTAKE LIP
444
AIR INTAKE LIP
434AR, 437AL, 438AR, 444AR, 447AL, 448AR
433AZ, 433BZ, 434BZ, 443AZ, 443BZ, 444BZ
434BR, 444BR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-010-A
Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
TASK 71-13-00-010-040-A
Opening of the Fan Cowl Doors
TASK 71-13-00-010-040-B
Opening of the Fan Cowl Doors
TASK 71-13-00-410-010-A
Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
TASK 71-13-00-410-040-A
Closing of the Fan Cowl Doors
TASK 71-13-00-410-040-B
Closing of the Fan Cowl Doors
3. Job Set-up
Subtask 05-24-30-010-050-A ** ON A/C NOT FOR ALL
A. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at zones 433 and 443.
   (2) Open the fan cowl doors:
437AL, 438AR, 447AL and 448AR (Ref. AMM TASK 71-13-00-010-040).
   (3) Remove the access panels:
433AZ 433BZ,
434AR 434BZ,
443AZ 443BZ,
444AR 444BZ.
Subtask 05-24-30-010-050-C ** ON A/C NOT FOR ALL
A. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) in position at zones 433 and 443.
   (2) Remove the access panels:
434AR 434BR,
444AR 444BR.
   (3) Open the fan cowl doors 437AL, 438AR, 447AL and 448AR (Ref. AMM TASK 71-13-00-010-010).
4. Procedure
Subtask 05-24-30-210-050-A ** ON A/C NOT FOR ALL
A. Inspection
   (1) Do a general visual inspection of the air intake lip and the inlet cowl.
   (2) Make sure that there are no signs of corrosion, cracks or damage.
   (3) Make sure that all the installations (wiring, ducting, piping) are correctly attached.
5. Close-up
Subtask 05-24-30-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the access panels:
433AZ 433BZ,
434AR 434BZ,
443AZ 443BZ,
444AR 444BZ.
   (2) Close the fan cowl doors 437AL, 438AR, 447AL and 448AR (Ref. AMM TASK 71-13-00-410-040).
   (3) Remove the access platform(s).
Subtask 05-24-30-410-050-C ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the access panels:
434AR 434BR,
444AR 444BR.
   (2) Close the fan cowl doors 437AL, 438AR, 447AL and 448AR (Ref. AMM TASK 71-13-00-410-010).
   (3) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 22:49:52 UTC